My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:59:53 PM
Creation date
2/16/2017 12:03:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 6 Byrd Lane <br />10 ......... .._ ........ ............................... 6 <br />Location ..... ............................... ... Byrd Lane <br />tion .................. ............................... Install approximately 300 feet of new 8 inch PVC pipe <br />Capital Improvement Cost..... $95,000 <br />P ................... ............................... (1) Pipes are listed in order from upstream to downstream <br />(ii) Locations of future manholes (and associated pipe segment lengths) are approximate <br />ins ................ ............................... (1) Cost estimates are based on March 2016 ENR CCI of 11178 <br />(ii) normal open cut construction techniques can be used (no blasting or dewatering) <br />PROJECT COST DETAIL <br />Total Baseline Pipe Construction Cost $ 48,223 <br />Baseline Construction Cost: $ 48,223 <br />Traffic Control (5% of pipe construction cost) $ 2,411 <br />Subtotal: $ 50,634 <br />Mobilization /Demobilization(SO %ofsubtmal) $ 10,000 <br />Estimated Construction Cost Subtotal: $ 60,634 <br />Engineering, Administration, Legal 125% of construction cost) $ 15,159 <br />Capital COO Subtotal $ 75,793 <br />r'. <br />Estimated Capital Improvement Cost: 5 95.000 <br />$MerProledCoslsxlsx S07C1M201 51912016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.