Laserfiche WebLink
Project 6 Byrd Lane <br />10 ......... .._ ........ ............................... 6 <br />Location ..... ............................... ... Byrd Lane <br />tion .................. ............................... Install approximately 300 feet of new 8 inch PVC pipe <br />Capital Improvement Cost..... $95,000 <br />P ................... ............................... (1) Pipes are listed in order from upstream to downstream <br />(ii) Locations of future manholes (and associated pipe segment lengths) are approximate <br />ins ................ ............................... (1) Cost estimates are based on March 2016 ENR CCI of 11178 <br />(ii) normal open cut construction techniques can be used (no blasting or dewatering) <br />PROJECT COST DETAIL <br />Total Baseline Pipe Construction Cost $ 48,223 <br />Baseline Construction Cost: $ 48,223 <br />Traffic Control (5% of pipe construction cost) $ 2,411 <br />Subtotal: $ 50,634 <br />Mobilization /Demobilization(SO %ofsubtmal) $ 10,000 <br />Estimated Construction Cost Subtotal: $ 60,634 <br />Engineering, Administration, Legal 125% of construction cost) $ 15,159 <br />Capital COO Subtotal $ 75,793 <br />r'. <br />Estimated Capital Improvement Cost: 5 95.000 <br />$MerProledCoslsxlsx S07C1M201 51912016 <br />