Laserfiche WebLink
Project 7 Alisal Street Force Main <br />PROJECT DESCRIPTION <br />ID.- ......... ............................. ......... <br />7 <br />Location .......... ............................... <br />Alisal Street Force Main <br />tlon .................. ............................... <br />Install approximately 2,200 feet of new 6Inch PVC pipe <br />a....................... ............................... <br />1 <br />ed Capital Improvement Cost ..... <br />$549,000 <br />nts ................... ............................... <br />(1) Pipes are listed in order from upstream to downstream <br />................ ............................... (i) Cost estimates are based on March 2016 ENR CCI of 11178 <br />(ii( normal open cut construction techniques can be used (no <br />PROJECT COST DETAIL <br />D/S ` er Slope Pipe Depth Corn mdbn thiR'd <br />MN ID (ttdtas)'- ( %) (feet BGL) Method ($ /LF) <br />Total Baseline Pipe Construction Cost $ 304,038 <br />Baseline Construction Cost: $ 306,038 <br />Traffic Control (5% of pipe construction cost) $ 15,202 <br />Subtotal: S 319,240 <br />Mobilization/Demobilization (10% of subtotal( $ 31,924 <br />Estimated Construction Cost Subtotal: $ 351,164 <br />Engineering, Administration, Legal (25% of construction cost) $ 87,791 <br />Capital Cost Subtotal $ 438,955 <br />mom=r <br />Estimated Capital Improvement Cost: $ 549,000 <br />SewerPFgectGoets. xlsx Fcr"Man S1912916 <br />