My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:59:53 PM
Creation date
2/16/2017 12:03:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 7 Alisal Street Force Main <br />PROJECT DESCRIPTION <br />ID.- ......... ............................. ......... <br />7 <br />Location .......... ............................... <br />Alisal Street Force Main <br />tlon .................. ............................... <br />Install approximately 2,200 feet of new 6Inch PVC pipe <br />a....................... ............................... <br />1 <br />ed Capital Improvement Cost ..... <br />$549,000 <br />nts ................... ............................... <br />(1) Pipes are listed in order from upstream to downstream <br />................ ............................... (i) Cost estimates are based on March 2016 ENR CCI of 11178 <br />(ii( normal open cut construction techniques can be used (no <br />PROJECT COST DETAIL <br />D/S ` er Slope Pipe Depth Corn mdbn thiR'd <br />MN ID (ttdtas)'- ( %) (feet BGL) Method ($ /LF) <br />Total Baseline Pipe Construction Cost $ 304,038 <br />Baseline Construction Cost: $ 306,038 <br />Traffic Control (5% of pipe construction cost) $ 15,202 <br />Subtotal: S 319,240 <br />Mobilization/Demobilization (10% of subtotal( $ 31,924 <br />Estimated Construction Cost Subtotal: $ 351,164 <br />Engineering, Administration, Legal (25% of construction cost) $ 87,791 <br />Capital Cost Subtotal $ 438,955 <br />mom=r <br />Estimated Capital Improvement Cost: $ 549,000 <br />SewerPFgectGoets. xlsx Fcr"Man S1912916 <br />
The URL can be used to link to this page
Your browser does not support the video tag.