Laserfiche WebLink
Work Sessions <br /> Planning Commission Work Session: At the October 17, 2011, Planning Commission meeting, <br /> the Commission was asked six questions regarding the two sites. Those questions are noted <br /> in italics with a summary of the Commission's comments thereafter. <br /> A. Would the Planning Commission support exceptions to the Hacienda TOD Standards <br /> and Guidelines if the project were to move forward as proposed? <br /> The Commission believed it could support exceptions to the live/work building depth <br /> given the uncertainty that the uses would be used as retail space and could support the <br /> substitution of alleys for internal streets because the alley street type of design that is <br /> proposed for both sites allows for more open space. The Commission requested that <br /> the main vehicular entries of the two sites be accentuated so people know they are the <br /> entryways and requested that the applicant return with visuals of what the entries will <br /> look like. <br /> B. Are the building designs appropriate in their physical context adjacent to large office <br /> buildings? <br /> Most of the Commissioners felt that the design for the two sites was appropriate, but <br /> requested that more consideration be given to the roof tops on Site 2. One <br /> Commissioner commented that more detailing on Site 2 should be added to reduce the <br /> "institutional" look. A request was made to have "really good" visuals when the <br /> application returns for a recommendation so that the Commissioners can get a better <br /> sense of what the project is going to look like standing on the ground and looking up. <br /> One Commissioner noted that she would have like to have seen more places where <br /> people can congregate within the complex. <br /> C. Are the proposed building colors and materials acceptable? <br /> The Commission felt that using different colors for each site was appropriate. They <br /> agreed with the applicant that the colors of Site 1 complemented the adjacent office <br /> buildings and the colors of Site 2 complemented the adjacent residential development. <br /> The Commission requested that larger color chips/samples be provided to help <br /> determine the actual colors since the plans are computer generated colors and don't <br /> truly represent the colors. <br /> D. Is the positioning of the buildings acceptable? <br /> The Commission was supportive of the positioning of the buildings for both sites. One <br /> Commissioner noted that the corner of Willow Road and Owens Drive (Site 1) was well <br /> designed and liked the positioning of the garages and how they are not exposed to the <br /> to the streets. <br /> PUD-85-08-12D, PUD-81-30-86D, and P11-0856 Planning Commission <br /> 3 of 25 <br />