Laserfiche WebLink
plane and break up the building mass. The roofline of the buildings would undulate to break <br /> up the building mass and add interest. The live/work building on Site 2 would feature brick <br /> veneer walls that will complete the adjacent residential subdivision. A color/material board will <br /> be available for viewing at the hearing. Staff believes the colors and materials for both sites <br /> are appropriate to the architectural style and will be complementary to existing adjacent <br /> developments. <br /> Signage <br /> Conceptual signage has been shown on the renderings, consisting of signs mounted on the <br /> top of the metal storefront canopies or building facades. Staff finds the general type and <br /> location of the signs to be acceptable. No signage information has been provided for the <br /> apartment identification. A condition has been included that requires the applicant to submit a <br /> comprehensive sign program for both sites prior to installation of any signs. <br /> School Impacts <br /> A condition of approval requires the project developer/applicant to work with the Pleasanton <br /> Unified School District and the Director of Community Development to develop a program, in <br /> addition to the school impact fees required by State law and local ordinance, to offset these <br /> projects long-term effects on school facility needs in Pleasanton. This program will be <br /> designed to fund school facilities necessary to offset these projects reasonably related effects <br /> on the long-term need for expanded school facilities to serve new developments in Pleasanton. <br /> Construction will not be allowed to start on either site until the terms of this program and/or <br /> funds have been approved by the City. The Pleasanton School District has not requested any <br /> additional mitigation beyond the above-noted program and impact fees. <br /> Climate Action Plan <br /> On February 7, 2012, the City of Pleasanton adopted a Climate Action Plan (CAP). The CAP <br /> was reviewed by the Bay Area Quality Management District and was deemed a "Qualified <br /> Greenhouse Gas Reduction Strategy" in accordance with the District's CEQA guidelines. <br /> Implementation of the CAP will occur over several years and will consist of amendments to <br /> regulations and policies related to Land Use and Transportation, Energy, Solid Waste, and <br /> Water and Wastewater, which will result in reductions in greenhouse gas emissions in <br /> compliance with the targets set by AB 32 California's Global Warming Solutions Act. In <br /> advance of full implementation of the City's CAP, staff has analyzed the consistency of this <br /> project with the CAP and is recommending several conditions of approval which address <br /> specific supporting actions included in the CAP. <br /> As a high density, mixed use, transit oriented project located near BART, several high <br /> frequency and commuter bus lines, and located within a major employment center, the BRE <br /> projects are generally consistent with Goal 1 of the CAP: to reduce vehicle miles traveled <br /> (VMT) through mixed use, infill and higher density development. In addition, several <br /> Strategies and Supporting Actions related to parking, transit use, water conservation, energy <br /> conservation from the CAP are implemented in the proposed conditions of approval in Exhibit <br /> A-1 and Exhibit A-2. <br /> PUD-85-08-12D, PUD-81-30-86D, and P11-0856 Planning Commission <br /> 20 of 25 <br />