Laserfiche WebLink
Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> Project Name Estimated Project Budget <br /> DEBRIS REMOVAL TBD <br /> (AS NEEDED) <br /> Stream Name Project Location <br /> multiple multiple <br /> Project Length (ft.) Project Area (acres) <br /> TBD TBD <br /> Project Goals: tf.:. 0 <br /> =j <br /> Removal of debris(trash, etc.)from target locations in or near`hannels. <br /> V.--,,:.'„..'''.1. .,.�� *, <br /> PROJECT SCOPE FOR 2017-18 5 ,o•-,..- <br /> „, a <br /> Maintenance: Removal of debris(trash, etc)from target locations in or near channels, as needed <br /> r <br /> Photo documentation: Before and after photo. - .. � - , ,. <br /> P <br /> ,Estimated:,Number of Work Days <br /> TOTAL work days, #of volunteer days <br /> Planting v1 :_ ?” res .. -"`Vi,',;, <br /> Maintenance - YY.: ,,�f 7. <br /> , `5 x <br /> Monitoring - ', ` <br /> Reporting :n.. , .&,, <br /> . 1.,f'�`-`' -'''''::7,::a's . - <br /> \',;!- <br /> ,% <br /> rye r',i- <br /> 18 <br /> 17 <br /> Photo documentationefore and�after photo. ¢`t, <br /> Reporting ifotlowing info nation wilt,ereporte�p„ <br /> • Notaibeir af'stak install and speed "s , <br /> • Length of treitrileWlineaVipgth of staites:or fascine installed) <br /> • Brief description of tr atmenf( =g., stakes,fascine,two tier fascine) <br /> • Brreflocation of installation, GPS coordinates and written description including which bank. <br /> r_ T' a„r,, �`.: <br /> IiiI4 VA, <br /> Estimated`Number oftWork'Days s< <br /> { `n , , TOTAL work days #of volunteer days <br /> Planting 10 <br /> Maintenance <br /> Monitoring <br /> Reporting <br /> 15 <br /> 14 <br />ork Days 4 , , .. <br /> „ � , TOTAL work days #of volunteer days <br /> c..x t. zv+•-” <br /> Planting � ,, „,,,_,I, 0 <br /> Maintenance 4 4,,i, , .,. •' 2 <br /> Monitoring . 0.5 <br /> Reporting 0.5 <br /> 13 <br />ring (March/April). <br /> (2) Remove o.rradjusttcages if oak growth becomes impeded. <br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is <br /> necessary. <br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from <br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to <br /> allow free flow of water. <br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />