My WebLink
|
Help
|
About
|
Sign Out
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2018 2:57:07 PM
Creation date
4/11/2017 2:31:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/4/2014
LONG TERM AGREEMENTS - NAME
TRI-VALLEY INTERGOVERNMENTAL RECIPROCAL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
Document Relationships
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT 14-1272
(Cross Reference)
Path:
\CITY CLERK\LONG TERM AGREEMENT\T
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> Project Descriptions— City of Livermore <br /> Project Name Estimated Project Budget <br /> GALAXY COURT TBD <br /> Stream Name Project Location <br /> Arroyo las Positas Arroyo las Positas downstream of Bluebell Dr. <br /> Project Length (ft.) Project Area (acnes) <br /> 1.48 acre <br /> 890 ft ;`-'a"`- <br /> : -- <br /> Project Goals: {,� ur" <br /> Assist in achieving survivorship goals for mitigation area tries and shrubs for the Galaxy Court <br /> Culvert Replacement Project by weeding, planting and hand waterif g ,r <br /> Trees are intended to compete with and (in time)slrade'�out cattails aindt:tales in the stream channel <br /> that increase risk of flooding in the adjacent neighborhood. _ ,:_ <br /> PROJECT SCOPE FOR 2017-18 a; is ,, 7;`'e <br /> 1 1*.. s x 4 .. . <br /> Planting:Replacement planting maybecessary in are;swhere plant survival is low. <br /> Maintenance: '`*& t, <br /> • Control weeds(hand weeding and/or strirldInmmer)once very as needed. <br /> • If hand watering bermes necessa?y CRCD (provide Live g Arroyos staff with a watering <br /> program. HandwAater�-oncetevery week duringttae.dgl�season(May—September)or as <br /> needed if heat...essed x -,--,-- ,7fi - _. <br /> • Trash removal times perg/ear. 4 <br /> r, <br /> Estimated�Number of Work= Days <br /> _ (' 2 • .• _, T'E'AL work days #of volunteer days <br /> Plantin {,. •-..--,=-15- -k` 2 <br /> g_*r <br /> Maintenance; ' -s 28+ 2 <br /> Monitoring ,,.:,- . <br /> Reporting ,-;:a- ° ; <br /> *Note: Maintenance'and monitotin should be conducted during same site visit if possible. <br /> r> <br /> 19 <br />ring <br /> Reporting <br /> 15 <br /> 14 <br />ork Days 4 , , .. <br /> „ � , TOTAL work days #of volunteer days <br /> c..x t. zv+•-” <br /> Planting � ,, „,,,_,I, 0 <br /> Maintenance 4 4,,i, , .,. •' 2 <br /> Monitoring . 0.5 <br /> Reporting 0.5 <br /> 13 <br />ring (March/April). <br /> (2) Remove o.rradjusttcages if oak growth becomes impeded. <br /> (3) Evaluate'i i eglit,species individually to determine whether immediate action is <br /> necessary. <br /> • Channel: Remove drift debris(fallen limbs, etc.,that have drifted into the project area)from <br /> center of channel; it can be moved to the side of bank or removed from channel entirely so as to <br /> allow free flow of water. <br /> NOTE:Early(February--March)weeding promotes establishment of native grasses,and the early spring weed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />