My WebLink
|
Help
|
About
|
Sign Out
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2018 2:57:07 PM
Creation date
4/11/2017 2:31:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/4/2014
LONG TERM AGREEMENTS - NAME
TRI-VALLEY INTERGOVERNMENTAL RECIPROCAL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
Document Relationships
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT 14-1272
(Cross Reference)
Path:
\CITY CLERK\LONG TERM AGREEMENT\T
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Living Arroyos Program I 2017-18 Workplan I Exhibit A <br /> Project Name Estimated Project Budget <br /> SPRINGTOWN RESTORATION— TBD <br /> CENTRAL/BLUEBELL DRIVE <br /> [CIP 201323:$5,000] <br /> Stream Name Project Location <br /> Arroyo Las Positas Central Avenue to Bluebell Drive <br /> Project Length (ft.) Project Area(acres) <br /> 500 ft 0.5 acre : -,_ <br /> Project Goals: 471,, <br /> Plant establishment with native plants and trees to shade the creektoaddress off site mitigation <br /> requirements from the Stream Maintenance Program: (Nofe:Tier 3 T,l itigation Area] <br /> PROJECT SCOPE FOR 2017-18 r Y,J =r; <br /> Planting: Replacement planting to meet success criteria requirements.ACR_CDwill work with the <br /> City to purchase plant material and coordinate plantin with Living-Arroyos. Replanting will need to <br /> occur in December 2017.to March 2018.depending upt oni#Qting results. <br /> Maintenance: Staff will coordinate and,conduct.periodic trash`removal following the Adopt A-Creek <br /> Spot logging and reporting procedures. A47. <br /> Watering: Living Arroyos Itiitififillmater plants as needeaffinal waterlr)g schedule TBD based on <br /> availability of irrigationn-s_.ystem) ,' _ _ . <br /> Monitoring: Living Arroyos staff will,In pect plantings once a month. Submit log to ACRCD and City <br /> detailing maintenance conducted, plant survival status and any replanting that is potentially needed. <br /> 11 - <br /> Photo do,cutt ehtabon Living Arra os staff will.estab ish photo points and complete pre and post <br /> photographs of work areae Compiet monthly photographs of planting area for monthly report. <br /> ReportideLiving Arroyos staff Twill coordinate with ACRCD to prepare annual report(with photos) <br /> for submittallo4egulatory ageii6i4s. PrOZEide7isurvival data.Summarize monthly reports:Annual <br /> reporting due in�.1 H.2017. <br /> Other:All staff-andvolunteers engaged in the project must receive environmental training prior-to <br /> start of any planting and pr maintenance activity. Coordinate with ACRCD to receive training. <br /> Stop`work if wildlife is presentand`consult biologist. Comply-with all permit requirements. <br /> .Estimated Number of Work Days <br /> TOTAL work days #of volunteer days <br /> Planting 2 2 <br /> Maintenance 12 (24 half days) 6(12 half days) <br /> Monitoring 12 (24 half days) 6( 12 half days) <br /> Reporting 0 0 <br /> Other:Training 0.5 0.5 <br /> -Note;Maintenance end monitoring should be conducted during same site visit if possible. <br /> 24 <br /><br /> Other:Training 0.5 0.5 <br /> Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 23 <br />ed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />