My WebLink
|
Help
|
About
|
Sign Out
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2018 2:57:07 PM
Creation date
4/11/2017 2:31:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/4/2014
LONG TERM AGREEMENTS - NAME
TRI-VALLEY INTERGOVERNMENTAL RECIPROCAL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
Document Relationships
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT 14-1272
(Cross Reference)
Path:
\CITY CLERK\LONG TERM AGREEMENT\T
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> T A <br /> Project Name Estimated Project Budget <br /> ARROYO MOCHO MEDEIROS PARKWAY TBD <br /> (OP 201323:STREAM MAINTENANCE PROGRAM] <br /> Stream Name Project Location <br /> Arroyo Mocho Rockrose Street <br /> Project Length (ft.) Project Area (acres) <br /> TBD TBD <br /> Project Goals: ••,= , • <br /> Mitigate for temporary and permanent impacts for Stream Maj t nance Program activities at this <br /> site and others. .,,44,1,-:,-,..„ <br /> PROJECT SCOPE FOR 2017-18 ay,,. <br /> Planting: Living Arroyos staff will oversee voluriteer1planting (following the approved planting plan) <br /> in December 2017/January 2018. Plants will be sourced by ACRCD. ', 1; <br /> vg � 4y;, ''Cc.�s4 <br /> Maintenance: Staff will coordinate and conduct periodic raslernoval following theAdopt-A-Creek <br /> Spot logging and reporting procedures , , - ,- 4` ' <br /> Watering: Living Arroyos staff will water�lantsas Heeded (final watering schedule TBD upon final <br /> planting plan and alert City staff when plants needplacement):x. % <br /> Monitoring: Living Arroyos staffaNillinspectp'lantingszonce.a$ onth Submit log to ACRCD and City <br /> detailing maintenancecan�ducted, plant survival status and aneplanting that is potentially needed. <br /> , ,lT.� ter _ <br /> Photo documentation:1 ing Arro s staff will establish photo points and complete pre and post <br /> photographs of inprk area drnpla a rt rit#lly photographs of planting area for monthly report. <br /> Reporting Not requir until fall;= 018 ''' :, <br /> Other:All staff and volunte rk-engaged�in the project must receive environmental training prior to <br /> start of anyilanting and/or maintenance.activity. Coordinate with ACRCD to receive training. <br /> Stop work if Wildlife is present and onsult l iblogist. Comply with all permit requirements. <br /> +Estimated Itiumber',7;•,,,-',L___,.-r <br /> Days __'.. �w,._. : ,__}. _. . <br /> --jw,. ; ) TOTAL work days #of volunteer days <br /> Planting <br /> Maintenance 12(24 half days) 6(12 half days) <br /> Monitoring 12(24 half days) 6(12 half days) <br /> Reporting 0 0 <br /> Other:Training 0.5 I 0.5 <br /> *Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 25 <br />hould be conducted during same site visit if possible. <br /> 24 <br /><br /> Other:Training 0.5 0.5 <br /> Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 23 <br />ed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />