My WebLink
|
Help
|
About
|
Sign Out
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2018 2:57:07 PM
Creation date
4/11/2017 2:31:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/4/2014
LONG TERM AGREEMENTS - NAME
TRI-VALLEY INTERGOVERNMENTAL RECIPROCAL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
Document Relationships
TRI-VALLEY INTERGOVERNMENTAL ZONE 7 MASTER AGMT 14-1272
(Cross Reference)
Path:
\CITY CLERK\LONG TERM AGREEMENT\T
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Living Arroyos Program a 2017-18 Workplan I Exhibit A <br /> Project Name Estimated Project Budget <br /> ARROYO LAS POSITAS AT SOUTHERN TBD <br /> CONVEYANCE(SMP SITE 18) <br /> [CIP 201323:STREAM MAINTENANCE PROGRAM] <br /> Stream Name Project Location <br /> Arroyo Las Positas Southern Conveyance Structure <br /> Project Length (ft.) Project Area (acres) <br /> 1836 ft TBD based on finalmitigation plan <br /> Project Goals: <br /> Lf S <br /> To mitigate for temporary and permanent impacts form S 'eamIMaiptenance Program activities at <br /> this site. Ensure successful plant establishment to meet#permit requirements. <br /> PROJECT SCOPE FOR 2017-18 • _. � <br /> Planting: Living Arroyos staff will oversee volunteer,planting (following the approved planting plan) <br /> in December 2017/January 2018. Plants will be sours d by AC C)j. ` `f <br /> a <br /> Maintenance: Staff will coordinate and onduct periodic treVreemoval following the Adopt A Creek <br /> Spot logging and reporting procedures , <br /> Watering: Living Arroyos staff will water plants as'fie0ded(final uvatermg schedule TBD upon final <br /> planting plan) and alertstiff when plants*need replace tent <br /> ,,,:;`" S, moi-. <br /> Monitoring: Living Arroyos staff will inspect plant ngs�once a month. Submit log to ACRCD and City <br /> detailing maintenance tducted, plant survival Itit6 and any replanting that is potentially needed. <br /> Pig <br /> Photo docuretation: Livn ,"Arra staff will establish photo points and complete pre and post <br /> photographs iuortt area. Confplete monthlyoliptographs of planting area for monthly report. <br /> Reportil g lot required rigmil 201 B.. <br /> Other:All staffand volunteers'engaged in tate project must receive environmental training prior to <br /> start of any planOig,and/or maintenance activity. Coordinate with ACRCD to receive training. <br /> Stop work if wildli`f 1spresent an`dtconsult biologist. Comply with all permit requirements <br /> Estimated Number-jof Worts Day <br /> ---"47,tf-:ii-v TOTAL work days #of volunteer days <br /> Planting 1 1 <br /> Maintenance 12 (24 half days) 6 (12 half days) <br /> Monitoring 12 (24 half days) 6( 12 half days) <br /> Reporting 0 0 <br /> Other:Training 0.5 ' 0.5 <br /> *Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 27 <br />25 <br />hould be conducted during same site visit if possible. <br /> 24 <br /><br /> Other:Training 0.5 0.5 <br /> Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 23 <br />ed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />