Laserfiche WebLink
Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> ,, a <br /> Project Descriptions — City of Pleasanton <br /> Project Name Estimated Project Budget <br /> UPPER TOURIGA CREEK RESTORATION TBD <br /> Stream Name Project Location <br /> Touriga Creek Touriga Creek between Touriga Drive and Vintage <br /> Hills Park <br /> Project Length (ft.) Project Area (0 0) <br /> 860 ft 7-5 <br /> 1.5 acres 4.er` <br /> Project Goals: ,�' j`- <br /> The removal of non-native plants from Upper Touriga Creek with the;use of volunteer groups. <br /> PROJECT SCOPE FOR 2017-18 `�>z .- r.. <br /> Maintenance: , <br /> Volunteers and crew will remove ivy, �a .� . <br /> non-native groundcavets,otter non-native plants (e.g. palms), <br /> and tree sucker growth from riparian con dor using hand tools.-Volunteers will assist`with the <br /> removal of plant material from the site, . %., <br /> C U -cp,,t--- ,i r-1,,. <br /> NOTE:(1) This site is covered by the Cits,Routine Maintenancer,Agreement(RMA)and vegetation <br /> removal may only take place-belyveen Mav'4Land Octabe115. (2) Coordinate with the Citywho will <br /> spray the top of bank tQ Ensor � O.adverse et cts to,c evuvr volunteers. <br /> Photo documentatidn ,- 4 - Y . <br /> 1..,i ,., <br /> Living Arroyos will photo document the vegetation(einoval process and provide photos of the site <br /> after the planf material hassbeen re coved;for each work/volunteer day. Photos to be forwarded to <br /> the City of,Pea T-within i4 days afferlthe completion of each work day. <br /> 4ws t+ -t <br /> Reporting. , ti. .. <br /> Living Ar oas will provide tt tl a City of Pleasanton a summary of each work/volunteer day. LA staff <br /> will submit1o1e City a copy ofthe Voluriteerr <br /> § Group Summary form within 14 days after the <br /> completion of-each work/volunte F day. <br /> '.Estimated,Number of Work Days `' TOTALwork days: #,of;volunteer,'days <br /> Maintenance gip,-. �.. Z._ 1 <br /> 28 <br />"47,tf-:ii-v TOTAL work days #of volunteer days <br /> Planting 1 1 <br /> Maintenance 12 (24 half days) 6 (12 half days) <br /> Monitoring 12 (24 half days) 6( 12 half days) <br /> Reporting 0 0 <br /> Other:Training 0.5 ' 0.5 <br /> *Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 27 <br />25 <br />hould be conducted during same site visit if possible. <br /> 24 <br /><br /> Other:Training 0.5 0.5 <br /> Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 23 <br />ed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />