Living Arroyos Program 12017-18 Workplan I Exhibit A <br /> Project Name Estimated Project Budget <br /> MARILYN MURPHY KANE TRAIL TBD <br /> Stream Name Project Location <br /> Arroyo de la Laguna 8!Bemal Creek Southern corner of the Marilyn Murphy Kane Trail <br /> accessible from Laguna Creek Lane <br /> Project Length(ft.) Project,Area (acres) <br /> 100 ft <br /> Project Goals: ,„-e-,,.„!, <br /> Remove illegally constructed BMX bike track at the top of bank b -Arroyo de la Laguna and remove <br /> trashas needed with the use of volunteers. t -;v , <br /> PROJECT SCOPE FOR 2017-18 : r=' . ''T. <br /> f��a. 3 :.,,,q,e. <br /> Maintenance: Remove BMX dirt mounds using hanid tools such as shovel nd tampers. Use <br /> volunteers to backfill and level ground as neededrijanize volunteers to colte~ trash along the <br /> walking trail,throughout the parklands and in the watr Nays evt`ry four months: 1; <br /> Monitoring:The City of Pleasanton w nitor trash loa4,2;d need for"BMX"course removal.The <br /> City of Pleasanton will notify Living Arrayos- ffwhen maim ance work is required. <br /> Photo documentation:City of Pleasanto Lwill phh'otg4ocument evil nce of trash and needed <br /> maintenance. Living Arr9y#4Ao-photo document trash re bvered,vq nteer work groups, activities <br /> and areas cleaned. Phots s are`lo l forwarded to,theOrtY4I leasanfon within 14 days after the <br /> completion of each wo 'ay. ' ={ <br /> ,.,� 'i. tom .:aft' <br /> Reporting: ''v* 3 °Y: ` ^: <br /> 4, <br /> Trash removal'. ill be logge' follp_ift-he City's Trsh°tCapture reporting forms and submitted to the <br /> City of FfleisXtinlAting Arroyos staff will also submit=aacopy of the Volunteer Group Summary for. <br /> Reportirlins to be foi*Pitled to the'City of Plea itpri within 14 days after the completion of each <br /> work/volii neer day. -== ;`_`' <br /> Estimated*1mber;of Work Days ' TOTAL work days r t #of volunteer days <br /> Maintenance 4 4 <br /> 29 <br />i-v TOTAL work days #of volunteer days <br /> Planting 1 1 <br /> Maintenance 12 (24 half days) 6 (12 half days) <br /> Monitoring 12 (24 half days) 6( 12 half days) <br /> Reporting 0 0 <br /> Other:Training 0.5 ' 0.5 <br /> *Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 27 <br />25 <br />hould be conducted during same site visit if possible. <br /> 24 <br /><br /> Other:Training 0.5 0.5 <br /> Note: Maintenance and monitoring should be conducted during same site visit if possible. <br /> 23 <br />ed- <br /> whacked materials should be left onsite as weed suppression, as appropriate. Also plan for weeding of Zones A, <br /> a and C in early fall-just prior to LARPD s fall application of chemical control(please coordinate.with Robert <br /> Martinez on timing). This material should not be left onsite in order to allow the chemical control to penetrate to <br /> the soil. <br /> 10 <br />an LARPD employee. <br /> 3 <br /> distributing material) <br /> • Secure sponsors for clean-up supplies and refreshments and send out thank you cards to <br /> sponsors after events. <br /> • Register outside volunteers for Spots 1, 8, 9, and10(e.g., identify spot needs, send out email <br /> invitations and follow-up with site captains and volunteers). <br /> 2 <br />