My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
041817
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 2:23:59 PM
Creation date
4/11/2017 4:16:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; <br /> FIRSTCARBON Proposal \� <br /> SOLUTiO \ S." <br /> Task 9: Screencheck Final EIR <br /> Once City staff provides comments on the Administrative Final EIR, FCS will prepare a Screencheck Final <br /> EIR that shows changes in track. <br /> Deliverables <br /> o Ten (10) hard copies of the Screencheck Draft EIR to the City of Pleasanton <br /> o One (1)electronic version of the Screencheck Final EIR to the City of Pleasanton <br /> Task 10: Final EIR <br /> Once City staff provides final comments on the Screencheck Final EIR, FCS will proceed with finalizing <br /> and producing the Final EIR for public review.This task assumes technical staff time will be required to <br /> complete revisions to the Final EIR, plus editing and administrative staff time to prepare the document <br /> for publication. If additional hours are required,we will prepare a budget augment to cover the actual <br /> level of effort. FCS will provide copies of the Final EIR to the City of Pleasanton,which will be responsible <br /> for local distribution, noticing, and posting. FCS will send copies of the Final EIR directly to state agencies <br /> that commented on the Draft EIR. Finally,this scope of work assumes that City staff will prepare and mail <br /> all notices associated with the Final EIR to local agencies and interested parties. <br /> Deliverables <br /> o Fifty(50) hard copies (appendices on CD), and one (1)electronic version of the Final EIR (including <br /> appendices) <br /> o One (1)CD of the Final EIR to each public agency that commented on the Draft EIR(FCS will be <br /> responsible for this task) <br /> Task 11: Mitigation Monitoring and Reporting Program <br /> FCS will prepare a comprehensive Mitigation Monitoring and Reporting Program (MMRP), pursuant to <br /> CEQA Guidelines Section 15097. The MMRP will contain all mitigation measures identified in the EIR. <br /> This comprehensive MMRP will provide City staff with a single source of reference to the full range of <br /> mitigation measures to be implemented. For each measure or group of similar measures,the agency <br /> responsible for ensuring proper implementation will be identified, along with the timing and method of <br /> verification. Copies of the MMRP will be included in the Final EIR submittal. <br /> Deliverables <br /> o One(1) electronic version (PDF format)of the MMRP to City of Pleasanton <br /> Task 12: Notice of Determination <br /> FCS will prepare the Notice of Determination and provide it to City staff or applicant for filing with the <br /> Alameda County Clerk's Office within 5 business days of EIR certification.As indicated in this scope of <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 23 <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.