My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
041817
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 10:23:59 AM
Creation date
4/11/2017 4:17:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• n •r.:e.Supply seismic anchorage calculations in accordance with California Building Code <br /> iv nd prepared by a Registered Struct r. 1:. -er in the State of California and shall <br /> be in compliance with California Building Code ' 2016. <br /> • Provide lifting eyes for structure and a removable roo or equipment removal/installation; <br /> specify weight of removable roof. <br /> • Noise shall be limited to 60 dBA within 25 feet of the enclosure(sound-proof paneling may be <br /> required,SPECIFY IN QUOTE) <br /> • Fiberglass exterior finish shall be approved by Owner prior to shipment. Provide standard color <br /> and finish (texture)options. Acceptable finishes shall include faux brick,wood panel or stucco, <br /> pending City approval. Smooth or untextured fiberglass shall not be acceptable. <br /> • Conduits and cables: Conduits and cables for communication,electrical and lighting that are not <br /> fully confined to the skid shall be preinstalled to the interior of the fiberglass enclosure, <br /> providing junction boxes for final cable connection by the City's Contractor. <br /> • Penetrations: Provide penetrations for power and communication cables,and equipment <br /> penetrations for enclosure-mounted equipment(lighting, HVAC,dehumidifier),as well as for <br /> louvers and any other known penetrations. Provide instructions and materials required to <br /> perform and make watertight for up to 3 additional field penetrations 4-inches in diameter or <br /> smaller. Recycled water piping will not penetrate the enclosure walls. <br /> OTHER REQUIREMENTS <br /> o American Iron and Steel(AIS) <br /> s - - - . .. . <br /> - - - '' - - - - <br /> stccl ais requirement <br /> guidance and g .«ions and <br /> • Station Bypass: <br /> o Connection between station suction piping and discharge piping <br /> o Multi-turn, motor Actuated gate valve with position signal <br /> o PLC logic operation modes as follows: <br /> G Bypass Mode: Lock all pumps out of operation and open motor actuated gate <br /> valve. <br /> • Booster Mode: Close motor actuated gate valve and bring all pumps into <br /> normal operation (unless manual locked out or failed) <br /> City of Pleasanton <br /> RW Booster Station Request for Quotation 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.