Laserfiche WebLink
S Station Off: Lock all pumps out of operation and close bypass valve. <br /> ■ Other requirements: <br /> • PLC shall communicate the operation mode status to City TESCO panel. <br /> • Transition between bypass and booster mode shall be coordinated such <br /> that pumps do not operate unless valve is fully closed.Time delays may <br /> be required. <br /> • Control sequence and logic shall provide for smooth operation and <br /> minimize hydraulic transients. Time delays and ramp times shall be fully <br /> adjustable as control set points. <br /> • Suction and discharge pressure gauges; range from zero to 125%of largest pump shutoff head <br /> (min) <br /> • No butterfly valves shall be included in the station; resilient seated gate valves shall be utilized. <br /> • Protective Coating: Epoxy Coating(SPECIFY IN QUOTE)on all equipment and piping unless <br /> stainless steel <br /> o All piping and pumps shall be purple(Pantone 512) <br /> • Suction/Discharge Diameter: 8"OR 10" (SPECIFY IN QUOTE)for large pumps;SPECIFY IN QUOTE <br /> for jockey pump(with pipe fittings to transition to piping sized for future large pump) <br /> • Spare Parts: <br /> o 1 mechanical seal per pump supplied <br /> • Complete Operations and Maintenance Manual for complete system <br /> o 5 hardcopies <br /> o 1 digital (pdf)copy on CD/DVD <br /> • Only product water(recycled water)shall be supplied for seal flushing. No potable water will be <br /> provided. Manufacturer's skid/equipment shall provide all provisions for flushing,as needed. <br /> • Structural design of concrete pad foundations to support the pump skid and enclosure, <br /> incorporating anchorage requirements,shall be provided by the Supplier and shall be prepared <br /> by a Registered Structur, • • -- in the State of California and shall be in compliance with <br /> California Building Code a 2016. Design shall include piping penetrations. <br /> • The Supplier shall provide a ful, minimum 1-year Warrantee against manufacturing defects <br /> from the date of start-up. <br /> o A one-year inspection will be performed at the end of the warrantee period. <br /> o Work included under the warrantee shall include labor, materials and equipment <br /> required to correct deficiencies at no cost to the City. <br /> SUBMITTAL OF QUOTATIONS <br /> • Quotations shall be responsive to the requirements included above and shall provide a complete <br /> and operable system upon installation by the Owner's Contractor. <br /> • Pricing shall include all equipment, materials,structural and anchorage design,shipping/freight <br /> from the place of manufacturer to the Owner's designated location (Pleasanton,California), <br /> sales tax and all other fees. Pricing shall be provided on the attached Quotation Form. <br /> • Quotation shall include a bill of materials and details for all items marked "SPECIFY IN QUOTE" <br /> above. <br /> • Quotation shall detail any proposed deviations from the requirements stated above,though the <br /> Owner reserves the right to reject any proposed deviation <br /> City of Pleasanton <br /> RW Booster Station Request for Quotation 8 <br />