My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
082917
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2017 5:07:37 PM
Creation date
8/21/2017 3:57:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/29/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Johnson Dr EDZ 4/17/2017 <br /> PLANNING LEVEL COST ESTIMATE <br /> Commerce Dr at Johnson Dr,Mitigation 4.D-la <br /> Roadway Items: Quantity Unit Unit Cost Item Total Total <br /> New Pavement Section' 2,250 SF $ 10 $ 22,500 <br /> Cold Plane and Overlay(0.2)' 24.250 SF S 2 5 48.500 <br /> Conc Sidewalk&Driveway' 3,810 SF S 10 S 38,100 <br /> Conc C&G 650 IF 5 30 S 19.500 <br /> Driveway 4 EA 9 5,000 5 20.000 <br /> Curb Ramp 2, EA 5 3.500 S 7.000 <br /> Retaining Wall - SF $ 100 5 - <br /> Maintenance Path - LS 5 20,000 5 - <br /> Monument Sign - LS 5 25,000 $ - <br /> Imported Borrow - CY $ 75 $ - <br /> Roadway Excavation' 760 CY 5 75 S 57.001) <br /> Clearing and Grubbing 2,450 SF S 0.5 S 1.300 <br /> Remove Conc Sidewalk,C&G 3.650 SF $ 6 $ 21,900 <br /> Remove Trees 1 EA 5 1.000 5 1,000 <br /> Landscapelnigation&Bio-Retention 2.200 SF S 15 S 33.000 <br /> Fence(New&Remove) - LF S 30 5 <br /> Pavement Striping 2.200 LF S 2 S 4.400 <br /> Pavement Markings 590 SF 5 10 $ 5.900 <br /> Relocate Overhead sign and post° • EA $ 5,000 $ - <br /> Signs 2 EA S 600 $ 1.200 <br /> Signalized Intersection(Johnson Or&Commerce Dr) 1 LS S 350.000 S 350.000 <br /> Intersection Traffic Signal Modification - LS S 750.000 S - <br /> Ramp Traffic Signal Modification - LS $ 25,000 $ - <br /> Street Lights s 3 EA S 10.000 S 30.000 <br /> Traffic Control Allowance(5% 1 LS S 34.000 S 34.000 <br /> Storm Drain System Allowance(10°F>) 1 LS 5 67.000 S 67,000 <br /> WPC/Treatment AOowance(5°.f,) 1 LS $ 34.000 $ 34.000 <br /> Minor&Misc.Items(104() 1 LS S 80,000 S 80.000 <br /> Mobilization(10%) 1 LS 5 88,000 S 88,000 <br /> Continency(2559 1 LS S 242.000 5 242.000 <br /> Roadway Subtotal S 1.210,000 <br /> Structure Items: Quantity Unit Unit Cost Item Total Total <br /> Widen Existing Structure" - SF S 350 5 - <br /> Structure Subtotal 5 - <br /> Right of Way Items: Quantity Unit Unit Cost Item Total Total <br /> Utility Relocation` I LS $ 38.000 S 38.000 <br /> DSRSD - LS 5 250.000 S <br /> Acquisition costs 1 LS S 164,800 S 164.800 <br /> TCE NIC <br /> Environmental Mitigation(Est) NIC <br /> Right of Way Subtotal S 210,000 <br /> Subtotal"Hard Costs' S 1,420.000 <br /> Soft Costs° Quantity Unit Unit Cost Item Total Total <br /> Final Design(12.555 1 LS S 152,000 S 152,000 <br /> Construction Administration(12.59q 1 LS $ 152,000 S 152.000 <br /> Construction Staking(2%n) 1 LS $ 25,000 $ 25.000 <br /> Subtotal"Soft Costs" $ 330.009 <br /> Grand Total S 1,750,000 <br /> I PYo Pavement Snclwn resunud m A 5'Asphalt,95'Agplate Base and 17'Agg nynta Subbase <br /> 2 t x61{dare al Mating pavement wilier the piled Grano <br /> .3 An?nme 6'wide adewalk <br /> 4 Rene o,clirg pool and most arm Imtall now sign paneb aid pool foundation. <br /> 5 Assume emtng street Ighla are to he salvaged by the Contractor Rae new street Irr"Sn at approumadaty 200'spacing <br /> 6 Pb work m I he cre°kfor t..dgo strucicro. <br /> 7 Uddy costs x'cuma.,main underground Imo,remain,only assumes cot for adprlmg vnulhMouanlma hydrants to grade or relocating them. <br /> 3.Gal cast o percentage of Roadwey..Structure Items/2017 doxrrsl incept P/N Engineering wits h is 19%of RN!Ilene. <br /> 9.Roudwuy excavation a•.oumos 25'cut ado existing ground. <br />
The URL can be used to link to this page
Your browser does not support the video tag.