Laserfiche WebLink
Pleasanton Johnson Dr EDZ 411712017 <br /> PLANNING LEVEL COST ESTIMATE <br /> Johnson Dr at Owens Dr(North)Intersection,Mitigation 4.D-lb <br /> Roadway Items: Quantity Unit Unit Cost Item Total Total <br /> New Pavement Section' - SF $ 10 $ - <br /> Cold Plane and Overlay(0.7)2 - SF S 2 $ - <br /> Conc Sidewalk&Driveway' - SF S 10 $ - <br /> Conc C&G - LF S 30 $ - <br /> Driveway - EA S 5.000 S - <br /> Curb Ramp - EA S 3.500 $ - <br /> Retaining Wall - SF $ 100 5 - <br /> Maintenanee Path - LS S 20.000 5 - <br /> Mommnent Sign - LS S 25.000 S - <br /> Imported Bonaw - CY $ 75 $ - <br /> Roadway Excavation'' - CY $ 75 $ - <br /> Clearing and Grubbing - SF S 0.5 $ - <br /> Remove Conti Sidewalk,CO - SF S 6 $ - <br /> Remove Trees - EA S 1.000 $ - <br /> Lartdscapo lnigation&Rio-Retention - SF $ 15 $ - <br /> Fence(New&Remove) - , LF $ 30 $ - <br /> Pavement Striping - LF 5 2 S - <br /> Pavement Markings - SF $ 10 5 - <br /> Relocate Overhead sign and post" - . EA S 5.000 $ - <br /> Signe - EA 5 600 $ - <br /> Signal¢ed Intersection(Johnson Dr 6 Owens Dr) 1. LS S 350,000 $ 350,000 <br /> Intersection Traffic Signal Modification - LS S 750.000 5 - , <br /> Ramp Traffic Signal Modification - LS $ 2080 5 - <br /> Street Lights' - EA S 10,000 S - <br /> Traffic Control Allowance(5%) - , LS S 18.000 S - <br /> Stonn Drain System Allowance(10%) - LS $ 35.000 $ - <br /> WPC I Treatment Allowance(5 5Q - LS $ 18.000 $ - <br /> Minor&lOsc.Items(10%) - LS 5 35.000 $ - <br /> Mobilcation(109) 1. LS $ 35.000 S 35.000 <br /> Contingency(25°.9 1 LS $ 97.000 S 97,000 <br /> Roadway Subtotal S 490.000 <br /> Structure Items: Quantity Unit Unit Cost !tern Total Total <br /> Widen Existing Structure 6 - SF , 5 350 $ - <br /> Structure Subtotal $ - <br /> Riq t of Way Items: Quantity Unit Unit Cost Item Total Total <br /> Utility Relocation - LS 5 - $ - <br /> DSRSD - LS S 250.000 $ - <br /> Acquisition costs - LS <br /> TCE MC <br /> Environmental Mitigation(Eat) MC <br /> Right of Way Subtotal S - <br /> Subtotal"Hard Costs" S 490.000 <br /> Soft Costs° Quantity Unit Una Cost tern Total Total <br /> Final Design(12.5°.4 1 LS S 62.000 S 62.000 <br /> Construction Administration(12.59) 1 LS S 62.000 $ 62,000 <br /> Construction Staking Mk) 1 LS S 10,000 S 10.000 <br /> Subtotal"Soft Costs" S 140.000 <br /> Grand Total $ 630,(100 <br /> 1.Kew Pxwriedt..n:tnn assumed arr.;5'Anpheit,3 5'Agyregats Faso xnd 17'Agyrrgale Snbbme <br /> 2 OA plc,w oIl oou1mg paoemerd*Ohm:ho prepect Iods, <br /> 3.lasumc 6 satin 341.:* <br /> 4 Rome onwing pant end mss'run Irctel now vdgn poneb sod purl foundation <br /> 6;MUM,oncdangoIreet 11,16 ere to be.antvntnd by the Cnrirxlor?Inca now street lghen et epl<..umbel),AV:peong <br /> 0 Nth erode in the coo d.ferbndgo chew. <br /> 7.Uddynmrs ensmrs moil unearorosnd linos roman,only o«umes coot for ockusfing va ltShoxeseiro hydrant to grotto or roldcolm Thorn <br /> 8 Stilt cad to porcmisge of Rosdrry-artrturo tlnm9(3)170011501 exopt 1/W Engiroonrg tltich a 10%of PM hems. <br /> 9 Roadway acxcaim xx,umea 26 cut woo amtng ground. <br />