Laserfiche WebLink
Program 1.1: Require new developments to pay for their fair share of planned roadway <br /> improvement costs. <br /> Program 1.2: Update the Traffic Development Fee study consistent with improvements <br /> needed to implement the General Plan circulation system. <br /> Program 1.1 is related to direct roadway improvements to mitigate the project(the$21.5 <br /> million identified). According to this policy, Costco and Nearon should pay the full amount <br /> without city subsidies. <br /> Program 1.2 refers to the TIF and that these funds should be applied to the city as a whole, not <br /> to the currently proposed project. The TIF should be used to mitigate the overall impacts to the <br /> General Plan circulation system from past projects. <br /> The TIF belongs to the public. Diverting TIF funds to mitigate new projects is essentially stealing <br /> from the public and a failure to mitigate impacts from previous development. The city proposal <br /> to use TIF funds as direct project mitigation is a misuse of the funds and likely would open the <br /> city to litigation. <br /> 6. Even if it was legitimate to use the TIF for this project, according to the 2010 TIF Nexus Study, <br /> only projects listed in the report qualify for TIF funds. The new 1-680 NB onramp lane is not <br /> included in the report and therefore does not qualify for the TIF to fund the$6.4 million project. <br /> There is a $400,000 project identified in the 2010 study at Stoneridge Dr. and Johnson Dr. but <br /> that does not justify a $3.7 million contribution. Furthermore,the 2010 study is based on the <br /> growth identified in the existing General Plan. The proposed EDZ project is not included in the <br /> General Plan and therefore not relevant to the 2010 TIF. The proposal is clearly a misuse of TIF <br /> funds and will likely leave the city open to litigation. <br /> 7. The strategy of inappropriately using the TIF to offset project infrastructure essentially shifts the <br /> majority of costs to the city. Using the TIF and the 50%share of Right of Way costs to fund the <br /> project results in a taxpayer contribution of$19 million, reduces Costco's true contribution to <br /> $2.45 million, and developer Nearon pays nothing. See table below: <br /> Total Infrastructure Cost=$21.5 million <br /> City TIF Contribution for additional 1-680 onramp lane=$6.4 million <br /> City Tax Sharing Contribution (with interest) =$8.2 million <br /> Costco TIF Contribution =$3.7 million (otherwise would go to other needed city projects) <br /> City ROW contribution =$750,000 <br /> Total City Contribution =$19.05 million <br /> Total Costco contribution =$2.45 million <br /> Total Nearon contribution=$0 <br /> In addition, any future payment by the city for the Tri Valley Transportation Fee will only <br /> increase the city's contribution. This is creative financing at best and hides the true nature of <br /> the public subsidy for the project. <br /> 8. How will the inevitable construction cost overruns be funded? <br /> 082917 SR Comments v2 Page 2 <br />