Laserfiche WebLink
Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> i I <br /> 4.E-2.Cultural Resources(cont.) <br /> Mitigation Measure 4.E-6:Human Remains.In the event that All Site developer shall Site developer Verify mitigation measure on Prior to issuance Verified by: <br /> human remains are discovered during ground disturbing activities for train workers and Community construction plans. of a grading and Date: <br /> a project under construction within the EDZ,the construction monitor their activities. Development Inspect site during construction building permit. <br /> contractor shall stop work immediately. No disposition of such human Site developer shall halt Department to ensure compliance with Field inspections <br /> remains shall take place,other than in accordance with the work and notify the project construction plans. during <br /> procedures and requirements set forth in California Health and Safety County Coroner, if construction. <br /> Code Section 7050.5 and Public Resources Section 5097.98. Per necessary. If <br /> these code provisions,the project developer shall ensure appropriate appropriate,Coroner <br /> notification of the County Coroner and the Native American Heritage shall notify NAHC. <br /> Commission,who in turn must notify the persons believed to be most NAHC shall notify Most <br /> likely descended from the deceased Native American for appropriate Likely Descendant. <br /> disposition of the remains. This measure shall be <br /> printed on all <br /> construction documents, <br /> contracts, and project <br /> plans. <br /> 4.E-3.Greenhouse Gases <br /> None required. 11_ _ <br /> 4.E-4.Geology and Soils <br /> None required. 1 <br /> 4.E-5.Hazards and Hazardous Materials <br /> Mitigation Measure 4.E-7:Soil and Groundwater Plan.For proposed All sites within Site developer shall Site developer RWQCB and or/DTSC- Prior to issuance Verified by: <br /> development on all sites within the EDZ undergoing or requiring the EDZ area prepare a Soil and RWQCB and/or Review and approve of a grading and Date: <br /> remediation of contaminated soil or groundwater,and prior to issuance undergoing or Groundwater Plan that State environmental specialist building permit. <br /> of a building or grading permit,the project developer shall demonstrate requiring adheres to all Department of (geologist or engineer).Verify Field inspections <br /> that its construction specifications include implementation of a Soil and remediation of specifications of this Toxic approved measures on during <br /> Groundwater Plan(SGP)prepared by a qualified environmental contaminated measure, unless this Substances construction plans. construction. <br /> specialist(geologist or engineer)and reviewed and approved by the soil or measure has already Control(DTSC) Engineering Department: <br /> agency or agencies with oversight over cleanup(San Francisco groundwater been achieved. Verification and inspection of <br /> Regional Water QualityControl Board[RWQCB]and/or State Community <br /> 9 site during construction to <br /> Department of Toxic Substances Control(DTSCD.The SGP shall Development ensure compliance with project <br /> describe requirements for excavation,stockpiling,and trans ort of soil Department <br /> q P construction plans. <br /> and disturbance of groundwater.The SGP shall also include a Engineering <br /> contingency plan to respond to the discovery of previously unknown Department for <br /> contamination.In addition,all construction activities shall require written verification. <br /> approval by either RWQCB or DTSC prior to commencement.The SGP <br /> shall be present on site at all times as ensured by the construction lead, <br /> and readily available to site workers and City staff as needed. 1 <br />