Laserfiche WebLink
, <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.E-5.Hazards and Hazardous Materials <br /> Mitigation Measure 4.E-8:Soil Vapor Barriers.For proposed All sites within Site developer shall Site developer RWQCB and or/DTSC- Prior to issuance Verified by: <br /> development on all sites within the EDZ undergoing or requiring the EDZ area install vapor barriers RWQCB and/or Review and approve building of a grading and Date: <br /> remediation of contaminated soil or groundwater,where residual determined by that adhere to all DTSC plans. building permit. <br /> contamination includes volatile components(such as the chlorinated the RWQCB or specifications of this Engineering Department <br /> solvent TCE),andprior to issuance of a buildingor gradingpermit,the DTSC to measure, unless this Community <br /> Development <br /> Verification. <br /> eoe <br /> project developer shall demonstrate to the City either that the building require the measure has already Department <br /> plans include vapor barriers reviewed and approved by San Francisco installation of been achieved. <br /> Regional Water Quality Control Board(RWQCB)or State Department vapor barriers Engineering <br /> of Toxic Substances Control(DISC)to be installed beneath in buildings Department for <br /> foundations for the prevention of soil vapor intrusion,or that RWQCB verification. <br /> or DTSC has determined that installation of vapor barriers is not <br /> necessary. <br /> 4.E-6.Hydrology and Water Quality <br /> None required. <br /> 4.E-7.Land Use and Planning <br /> None required. <br /> 4.E-8.Population and Housing • <br /> None required. <br /> 4.E-9.Public Services and Utility Systems <br /> Mitigation Measure 4.E-9: For any project proposed for development All Site developer shall Site developer � Community Development Prior to the Verified by: <br /> within the EDZ, prior to the recordation of a Final Map,the issuance of provide written Community Department for verification. recordation of a Date: <br /> a grading permit,the issuance of a building permit,or utility extension verification from theDevelopment Final Map,the <br /> approval,whichever is sooner,the project developer shall submit Alameda County FloodDepartment for issuance of a <br /> written verification from the Alameda County Flood Control and Water Control and Water verification. grading permit, <br /> Conservation District Zone 7(Zone 7)or the City's Utility Planning Conservation District the issuance of a <br /> Division that water is available for the project.This approval does not Zone 7(Zone 7)or the building permit, or <br /> guarantee the availability of sufficient water capacity to serve the City's Utility Planning utility extension <br /> project. Division that water is approval, <br /> available for the project. whichever is first. <br /> 4.E-10.Recreation <br /> None required. <br />