Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101. <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibilityi 30'i'1° <br />Timing <br />Signature <br />• A set of comprehensive traffic control measures, including <br />activities to be <br />constructed by it per <br />the scheduling of major truck trips and deliveries to avoid <br />PUD conditions of <br />peak traffic hours, detour signs and flag persons if required, <br />approval, the <br />lane closure procedures, signs, cones for drivers, and <br />Stoneridge Drive <br />designated construction access routes. In addition, the <br />Specific Plan <br />information will include a construction staging plan for any <br />Amendment, and/or <br />the Development <br />public right-of-way used of each phase of the proposed <br />Agreement; Project <br />project. <br />Sponsor for the bridge <br />and all construction <br />• Provisions of parking management and spaces for all <br />activities to be <br />construction workers for each phase of construction. <br />constructed by it per <br />the Stoneridge Drive <br />• Notification procedures for adjacent property owners <br />Specific Plan <br />regarding when major deliveries, detours, and lane closures <br />Amendment and the <br />will occur. <br />Development <br />Agreement. <br />• The location of construction staging areas for materials, <br />equipment and vehicles. <br />Endnote #6 applies. <br />• The identification of haul routes for the movement of <br />Field inspections: City <br />Field'inspections: <br />construction vehicles that would minimize impacts on <br />of Pleasanton <br />During <br />vehicular traffic, circulation, and safety; and a provision for <br />Engineering Division. <br />construction. <br />monitoring surface streets used for haul routes so that any <br />damage and debris attributable to the haul tracks can be <br />identified and corrected by the project developers. <br />• A process for responding to, and tracking complaints <br />pertaining to construction activity, including identification of <br />an on-site complaint manager. <br />S -TR -2. / Improve Santa Rita Road at Stoneridge Drive (#32). S -TR -2.1 <br />has been incorporated into TR -1.3(a). <br />41 <br />