Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING.PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility'","' <br />Timing <br />Signature <br />S-TR-4.1 Payment of Regional Tri-Valley Transportation Development <br />Verify payment of <br />Payment of TVTC fee: <br />Prior to issuance <br />Fees. Payment of TVTC fees to fund improvements to State Route 84, and <br />TVTC fees. <br />Project developers <br />of building <br />Signature <br />HOV lanes on I-580 and I-680. Improvements to parallel corridors will <br />and, to the extent so <br />permits.provided <br />Title <br />in the <br />provide alternative routes and additional capacity to reduce local traffic <br />development <br />Date <br />impacts. <br />agreement, the City of <br />Pleasanton. <br />Verification of <br />payment: City of <br />Pleasanton. <br />Water Supply <br />WS-1.1 Verify water supply prior to tentative map approval. The <br />Verify water supply <br />Verification: City of <br />Prior to a tentative <br />Signature <br />conditions of approval for any tentative subdivision map shall include a <br />verification is <br />Pleasanton Planning <br />map approval. <br />condition requiring that sufficient water supply shall be available for the <br />completed. <br />Division. <br />Title <br />project. The water supply verification must include documentation of <br />Implementation: <br />Date <br />historical water deliveries for the previous 20 years, as well as a <br />Project Sponsor and <br />description of reasonably foreseeable impacts of the proposed subdivision <br />Project Developers. <br />on the availability of water resources of the region. <br />KFA w1mR, <br />TR-IC Improve Hopyard Road at Owens Drive (#10). Mitigation <br />Measures TR-1C has been incorporated into Mitigation Measure TR-1.3 as <br />mitigation for the approved project. Mitigation Measure TR-1.3 will <br />therefore also reduce cumulative impacts to a less than significant level. <br />TR-2C Improve Hopyard Road at Stoneridge Drive (#11). To reduce the <br />Verification of fee <br />Payment of fee: <br />Prior to issuance <br />Signature <br />project's contribution to cumulative PM impacts to this intersection, the <br />payment. <br />Project Developers <br />of building <br />and, to the extent so <br />permits. <br />following lane configurations and modifications are recommended: <br />provided in the <br />Title <br />development <br />Construction of <br />Date <br />• Eastbound leg — Provide free right turn lane <br />agreement, the City of <br />improvements: <br />Pleasanton. <br />As determined by <br />42 <br />