Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility"°'°'O' <br />Timing <br />Signature <br />This mitigation would improve the cumulative AM operations from LOS <br />Engineering Division. <br />E to LOS C. - <br />This project is not included in the Phase 1 Interchange Improvement to be <br />constructed by the City of Dublin. This improvement has been identified <br />in the City of Livermore's El Charro Specific Plan EIR. As provided in <br />the Cost Sharing Agreement dated September 4, 2007 between the Cities <br />of Pleasanton and Livermore and the Surplus Property Authority of <br />Alameda County, if the City of Livermore has not constructed the <br />modification to the Caltrans I-580/Fallon Road Interchange Modification <br />(Project #04-257604) that -is identified in this EIR, the City of Pleasanton <br />will be responsible to construct the modification. <br />TR -7C Deleted per FEIR, at page 4-23. Intersection improvements will <br />be constructed as part of the Project. <br />TR -8C Improve Fallon Road at Dublin Boulevard (#56). To reduce the <br />Verify that Pleasanton <br />Confer with local <br />Confer with local <br />Signature <br />project's contribution to cumulative PM impacts to this intersection, <br />has conferred with the <br />agencies concerning <br />agencies <br />City of Dublin, the City <br />fair -share mitigation <br />concerning fair - <br />Title <br />provide a free single eastbound right -turn lane. This mitigation would <br />of Livermore, and <br />costs as provided in <br />share mitigation <br />improve the cumulative PM operations from LOS E to LOS D. <br />Alameda County on a <br />the mitigation <br />costs as stipulated <br />Date <br />strategy to fund and <br />measure: City of <br />per the mitigation <br />If the City of Dublin chooses not to implement this improvement, the <br />complete mitigation <br />Pleasanton <br />measure: Prior to <br />impact would be significant and unavoidable. <br />measures within each <br />Engineering Division. <br />recordation of a <br />other's jurisdictions <br />final map. <br />with the goal to ensure , <br />This intersection is located in the City of Dublin. See Mitigation Measure <br />contribution of fair - <br />TR -1 IC about an interagency cooperative agreement that could provide a <br />share mitigation costs if <br />Intersection <br />Intersection <br />mechanism for cost sharing among multiple jurisdictions to address a <br />other jurisdictions are <br />improvements: <br />improvements: <br />also willing reciprocate. <br />City of Dublin. <br />As determined by <br />project's impact in a neighboring community. <br />the City of Dublin. <br />TR -9C Improve Tassajara Road at Central Parkway (#60). To reduce the <br />Verify that Pleasanton <br />Confer with local <br />Confer with local <br />Signature <br />project's contribution to cumulative PM impacts to this intersection, <br />hasconferred with the <br />agencies concerning <br />agencies <br />45 <br />