Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibilityl,flJ11'1° <br />Timing <br />Signature <br />The archaeological consultant shall prepare a Final Archaeological <br />Resources Report, meeting City and state standards, evaluating the <br />historical importance of the archaeological resource and describing the <br />archaeological and historical research methods employed in the testing, <br />monitoring, and data recovery programs. The Director of the Planning <br />and Community Development Department shall review and approve this <br />document. The project developer/sponsor shall file the report with <br />appropriate state offices. <br />GEO-1 The Project Sponsor, or a designee approved by the City, shall <br />Verify that a master <br />Verification of <br />Report submittals <br />Signature <br />submit a master geotechnical report for the entire Staples Ranch site. The <br />geotechnical report for <br />geotechnical report <br />and verification of <br />the entire Staples Ranch <br />submittals and <br />geotechnical <br />Title <br />master geotechnical report shall be subject to the review and approval of <br />site is submitted; verify <br />qualifications of <br />engineer's <br />the City of Pleasanton Engineer prior to Tentative Map approval. The <br />that each project <br />geotechnical engineer: <br />qualification:. <br />Date <br />content of the report shall be subject to the review and approval of the <br />developer submits a <br />City of Pleasanton <br />Prior to Tentative <br />City Engineer and shall address general items for the site such as <br />detailed geotechnical <br />Engineering Division. <br />Map approval. <br />removing expansive soil, general secondary earthquake impacts, <br />report; verify all <br />buildings set back a <br />Submittal of master <br />geotechnical report: <br />stockpiling native soils as fill. Each project developer shall submit <br />minimum of 20 feet <br />Project Sponsor or <br />detailed geotechnical engineering studies specific to its development <br />from top of arroyo <br />designee approved by <br />project for the review and approval of the City of Pleasanton Engineer for <br />bank; field inspections. <br />the City of Pleasanton. <br />review prior to the issuance of a building permit for its development <br />Submittal of detailed <br />project. <br />geotechnical reports: <br />Project Developers. <br />All buildings shall be set back a minimum of 20 feet from the top of the <br />arroyo bank, in case there is a seismically induced bank failure. <br />Endnote ##5 applies. <br />Field inspections: <br />City of Pleasanton <br />Field inspections: <br />Building and Safety <br />On-going during <br />Division and <br />construction. <br />Engineering Division. <br />Verify building <br />51 <br />