Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility,""' <br />Timing <br />Date Completed/ <br />Signature <br />setback: City of <br />Verify building . <br />Pleasanton Planning <br />setback: Prior to <br />Division. <br />issuance of a <br />building permit. <br />UT -1 Irrigation plans shall incorporate low flow irrigation head and/or <br />Verify irrigation plans <br />Verification: City of <br />Verification: Prior <br />drip irrigation with electric controllers set to water after T 00 p.m. and <br />include low -flow <br />Pleasanton Planning <br />to issuance of a <br />Signature <br />before 10:00 a.m., and proper soil preparation for landscaped areas that <br />includes a minimum of two inches of mulch and two inches of organic soil <br />irrigation techniques <br />and proper soil <br />preparation for <br />Division. <br />Building Permit. <br />Title <br />amendment, as recommended by a qualified landscape architect. <br />landscaped areas; field <br />Implementation: <br />Implementation: <br />Date <br />inspections. <br />Each Project <br />During <br />Developer for its PUD <br />construction. <br />site and related <br />construction activities <br />to be constructed by it <br />per PUD conditions of <br />approval, the <br />Stoneridge Drive <br />Specific Plan <br />Amendment, and/or <br />the Development <br />Agreement; Project <br />Sponsor for the bridge <br />and all construction <br />activities to be <br />constructed by it per <br />the Stoneridge Drive <br />Specific Plan <br />Amendment and the <br />Development <br />Agreement. <br />Field inspections: <br />Field inspections: <br />City of Pleasanton <br />Prior to issuance <br />Building and Safety <br />of final building <br />Division or Public <br />permit. <br />52 <br />