My WebLink
|
Help
|
About
|
Sign Out
20
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
082118
>
20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2018 5:08:55 PM
Creation date
8/16/2018 11:10:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/21/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase III- In Phase III of the Master Plan,the Administration Building <br /> would be built in the area north of the current existing building. Site <br /> improvements will include landscaping and concrete walkways. The <br /> parking constructed in Phase II will service the Phase III addition. <br /> Fire Access: Fire access is provided to all buildings from the north and <br /> south parking lots via the entrance on South Valley Trails Road with a <br /> Fire lane connecting the two parking area's. To enable the fire trucks to <br /> make a 180 degree turn on site,a Hammerhead layout will be provided. <br /> The parking lot drive aisles,turning radii, Hammerhead and other <br /> configurations have been designed in accordance with Livermore- <br /> Pleasanton Fire Department standards. The parking layout has been <br /> reviewed by the Fire Department and found to be appropriate for their <br /> requirements. Two fire hydrants will be placed on site as directed by the <br /> Fire Marshall. <br /> Construction Staging: Initial improvements for Phase II would develop <br /> the new north parking lot and grade the pad area for the Worship Facility. <br /> The south parking area would remain open for weekday and weekend <br /> Church and Mason use until the north parking lot is complete. The south <br /> parking area will then be utilized for the construction materials yard and <br /> staging. <br /> Phase III staging would utilize a small portion of the north parking area, <br /> and area adjacent National Park Drive; the north parking area would <br /> remain open and accessible to the Church and Masons during <br /> construction. <br /> Lighting: Lighting will be provided throughout the parking areas for <br /> security and safety at a maximum I footcandle/s.f. The lighting will be <br /> maximum 25-foot pole mounted lights, with shielded reflectors to direct <br /> light out and downward away from property lines and neighboring <br /> properties. The perimeter of the buildings will have downlights or <br /> landscape uplights for building accent. Low-level bollard lights will be <br /> placed along pedestrian paths. <br /> Landscaping: Landscaping will be provided around each building and <br /> parking areas at each phase of the development. The landscape plan <br /> provides a palette of plant materials to provide a coordinated campus feel <br /> at the completion of build-out. <br /> Trash: A new trash enclosure would be built with development of Phase <br /> II. The trash enclosure would be located in the north-east corner of the <br /> existing south parking lot and would be structured to comply with current <br /> local and State requirements for masonry enclosure, steel gates,overhead <br /> covering and internal drainage. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.