My WebLink
|
Help
|
About
|
Sign Out
20
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
082118
>
20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2018 5:08:55 PM
Creation date
8/16/2018 11:10:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/21/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
legal or were impractical. He stated improvements would be difficult to pay for without income <br /> for Chabad and he believed Chabad was very capable of being a good neighbor. <br /> Rabbi Resnick thanked the Commission and said what they propose is a very watered-down <br /> version of what they really wanted and thought what they compromised with was significant. <br /> He thanked staff for their months of work for the project and asked the Commission if similar <br /> restrictions have been placed on other houses of worship. <br /> THE PUBLIC HEARING WAS CLOSED. <br /> Mr. Beaudin clarified and corrected some of the points of information noted in the testimony: <br /> • The proposed timeframes for use of the playground space comes directly from the <br /> application. <br /> • Given the preschool space was going to be a new use at this location, staff reviewed <br /> the hours of operation and the buffer space between the back of the building and rear <br /> fences to the homes. <br /> • The application does not include a proposed use for the area outside of the playground <br /> and patio, did include the space on the north side of the building for use as the <br /> playground. Through discussions staff recommended shifting the outdoor play area to <br /> the other side of the building and there is a proposed patio area by the parking lot. <br /> • All proposed outdoor uses including the 15 events come from the application itself. <br /> • There is confusion about the CUP process works and CUPs run with the land. There <br /> was a determination when Rabbi Resnick purchased the property that he agreed to <br /> operate the location consistent with the CUP that was running with the land with the <br /> understanding that he did want to do more things at that location, for which Chabad <br /> would need to submit for a new application. <br /> BREAK <br /> Chair Nagler adjourned the meeting at 9:15 p.m., and thereafter, reconvened the meeting at <br /> 9:28 p.m. <br /> Commissioner Ritter asked what percentage of the 54 conditions the applicant had agreed <br /> with. <br /> Mr. Beaudin replied that Mr. Schwartz called out five outstanding conditions of approval they <br /> are concerned with out of the 54 conditions of approval and they include: <br /> • Condition Nos. 5; the outdoor activities and limited the location of activities. Staff noted <br /> that for this site there is sensitivity to noise and activity in outdoor areas. He referred to <br /> Exhibit B.1; the Chabad's narrative for the CUP which speaks to the preschool daily <br /> schedule. If there is more flexibility necessary there, staff can update it. <br /> • Condition No. 8; use of the playground specific to hours of use. Regarding activity in the <br /> buffer area, Mr. Beaudin said there is space for outdoor events proposed which is part <br /> of the site plan outdoor near the parking lot area. <br /> • Condition No. 19; surveying the parking condition during the first year of usage of the <br /> facility. Regarding parking, this is an intensification of the use and a wider range of uses <br /> that will occur on the property and staff is suggesting that parking should be monitored <br /> for the first year of use. If there are issues they can be addressed. <br /> EXCERPT: PLANNING COMMISSION MINUTES, June 27, 2018 Page 8 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.