My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
031119
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:06:34 PM
Creation date
3/6/2019 4:06:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/11/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Planning Commission <br /> February 19, 2019 <br /> Page 2 of 6 <br /> To allow for flexibility as small cell technology advances, the Draft Policy should <br /> be approved and regularly updated by the Director of Community Development, and not <br /> the Council. To comply with the Small Cells Order, the City must consult with Verizon <br /> Wireless and other carriers to develop workable, objective standards for a small cell <br /> design that will qualify for administrative approval with no public notice or appeal. At a <br /> minimum, the Draft Policy must be delayed due to the infeasibility of the technical <br /> requirements imposed, and the Director must hold a stakeholders' meeting with industry <br /> to resolve these technical infeasibilities prior to adoption. Verizon Wireless would be <br /> pleased to meet with staff to discuss its network plans for Pleasanton and workable <br /> regulations. <br /> As we explain, numerous requirements of the Draft Policy contradict the FCC's <br /> directives and must be removed or revised. Our comments are as follows. <br /> Public Notice and Appeals Are Inappropriate for Review Under Objective <br /> Standards. <br /> While administrative approval of small cells is appropriate, soliciting public <br /> comment through notice procedures would introduce subjectivity and the illusory <br /> impression that personal concerns would override objective standards. Draft Policy §§ <br /> 2.4(a), 2.4(b). Under the Small Cells Order, the FCC determined that small cells must be <br /> reviewed under objective criteria, and for this reason, requirements for public notice <br /> should be stricken. At most, notice should be provided to neighboring property owners <br /> for informational purposes. <br /> Because appeals involve notice and hearings, they also introduce subjectivity to <br /> final decisions, particularly if heard de novo by the Council. Draft Policy § 2.4(f). At a <br /> minimum, any appeal record should be restricted to the materials that were considered by <br /> the Director, and the scope of review should be limited to confirming whether the <br /> Director's decision was based on reasonable, objective criteria in compliance with the <br /> Small Cells Order. <br /> Location Preferences Should Be Revised to Encourage Small Cells in All <br /> Rights-of-Way and on Existing. Utility Poles. <br /> The list of preferred right-of-way locations could eliminate numerous stretches of <br /> right-of-way from consideration in conflict with state law. Draft Policy § 2.6(b). Public <br /> Utilities Code Section 7901 grants telephone corporations such as Verizon Wireless the <br /> right to place their equipment along any public road or highway, and it does not favor <br /> certain types of roads (such as arterial roads or commercial and industrial areas) over <br /> others (such as collector/local roads or residential areas). <br /> If strictly applied, the top preference for siting on City-owned street light poles in <br /> the right-of-way may contradict California Government Code Section 65964(c) which <br />
The URL can be used to link to this page
Your browser does not support the video tag.