Laserfiche WebLink
Pleasanton Planning Commission <br /> February 19, 2019 <br /> Page 3 of 6 <br /> bars local governments from requiring that wireless facilities be limited to sites owned by <br /> particular parties. Draft Policy § 2.6(d). <br /> As a member of the Northern California Joint Pole Authority, Verizon Wireless <br /> may place its small cells on joint utility poles. Location preferences should be relaxed to <br /> accommodate use of joint utility poles where they are found along the right-of-way, <br /> giving them a preference equal with street light poles. Small cell equipment is not"out- <br /> of-character" on utility poles, given existing utility lines and infrastructure, and structure <br /> preferences used to deny this option would be unreasonable. We suggest that the right- <br /> of-way structure preferences simply favor the existing structures in the proposed list over <br /> new poles. <br /> The Draft Policy requires applicants to show that any higher-preference right-of- <br /> way locations or structures within a 750-foot radius are unavailable or technically <br /> infeasible. Draft Policy §§ 2.4(c)(2), 2.4(c)(4), 2.6(a). Steering small cells up to 750 feet <br /> distant from a required location could result in a target coverage area remaining <br /> underserved or unserved. This would thwart the objectives of"densifying a wireless <br /> network, introducing new services, or otherwise improving service capabilities," and it <br /> would pose an effective prohibition of service in violation of the Telecommunications <br /> Act. See 47 U.S.C. §§ 253(a), 332(c)(7)(B)(i)(II); Small Cells Order,¶37. One <br /> unintended consequence of the 750-foot threshold is that numerous small cells could end <br /> up clustered together instead of distributed along a right-of-way. <br /> Due to conflicts with state and federal law as well as common sense, the 750-foot <br /> radius should be reduced to a practicable distance. At most, applicants for right-of-way <br /> facilities should demonstrate unavailability or technical infeasibility of any reasonable <br /> higher-preference locations or structures within 200 feet along the subject right-of-way. <br /> Underzroundinz and Equipment Placement Requirements Are <br /> Unreasonable. <br /> The FCC determined that undergrounding requirements, similar to aesthetic <br /> requirements, must be reasonable, non-discriminatory and objective. Small Cells Order, <br /> ¶¶ 86, 90. The Draft Policy requires that accessory equipment be placed underground in <br /> rights-of-way where utilities are primarily underground, with no exceptions. Draft Policy <br /> § 2.7(b)(3)(A). There is no reason to require undergrounding of small pole-mounted <br /> equipment components. Wireless carriers developed small cell equipment to provide <br /> needed service with minimal visual impact. Small equipment boxes on street light poles <br /> are not"out-of-character" among typical infrastructure in the right-of-way, even in areas <br /> lacking utility poles. <br /> The absolute volume limit of only nine cubic feet for above-ground accessory <br /> equipment in residential districts may preclude required network components, <br /> particularly given the separate requirement to conceal equipment behind a shroud that <br /> would could toward the volume limit. Draft Policy §§ 2.7(b)(3)(C), 2.7(b)(3)(F). At a <br />