My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
031119
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:06:34 PM
Creation date
3/6/2019 4:06:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/11/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton City Council <br /> February 20, 2019 <br /> Page 3 of 6 <br /> services, so long as it does not"incommode" the public use of the public right-of-way. And <br /> under Section 7901.1, AT&T's right is subject only to the city's reasonable and equivalent time, <br /> place, and manner regulations as to how AT&T constructs in the public rights-of-way. <br /> Specific Comments on the Proposed Policy <br /> 1. Other Permits and Approvals. Section 2.1(d) requires additional permits and approvals. <br /> Under the Infrastructure Order, all associated permits and approvals are subject to the applicable <br /> federally-mandated shot clock." Thus, the city must take final action within 60 days on all <br /> necessary permits and approvals, inclusive of appeals, with respect to requests to collocate small <br /> wireless facilities, and within 90 days for non-collocation small wireless facility requests.'2 <br /> 2. Site Survey. AT&T objects to Section 2.2(a)(4) of the Proposed Policy, which requires <br /> applicants to submit a survey identifying and depicting all existing boundaries, encroachments <br /> and other structures within 500 feet from the proposed project site. AT&T respectfully requests <br /> that the site survey radius be reduced to or below 200 feet, as small wireless facilities are by <br /> definition small and are not out-of-character given existing infrastructure in the right-of-way. <br /> 3. Applications Deemed Withdrawn. Section 2.3(b) provides that an application is deemed <br /> withdrawn when an applicant does not respond to an incomplete notice within 60 calendar days. <br /> The city should eliminate this procedure. This is inconsistent with the mechanics of the FCC shot <br /> clocks. And it is not uncommon for a delayed response by an applicant to be the result of the <br /> applicant and city staff working together to resolve issues, which should be encouraged. <br /> 4. Batched Applications. AT&T objects to Section 2.3(c), which limits batched applications <br /> to five small wireless facilities and deems the entire batch incomplete/withdrawn/or denied if any <br /> application in the batch is incomplete/withdrawn/or denied. This is inconsistent with the <br /> Infrastructure Order and the corresponding rule, which do not authorize batching limitations.'3 <br /> 5. Location Preferences. The Proposed Policy requires the applicant to demonstrate that a <br /> proposed project would be in the most preferred location(Section 2.4(c)(2)) and on the most <br /> preferred support structure (Section 2.4(c)(4))that are technically feasible within 750' of the <br /> proposed location under Sections 2.6's location requirements. The city can articulate appropriate <br /> location preferences, but AT&T has a legal right to place its facilities in the public rights-of-way, <br /> and the city is limited to reasonable and nondiscriminatory regulations. Further, state and federal <br /> laws preclude the city from requiring this type of analysis for wireless applications when the city <br /> does not require it from other infrastructure deployments. Moreover, minimum spacing <br /> requirements may result in an unlawful effective prohibition of service because the spacing will <br /> undercut the ability to densify wireless networks. <br /> As a practical matter, the city should reconsider its preferences and prohibitions against <br /> siting wireless facilities near residential areas and along Main Street in Section 2.6. Small cells <br /> 11 See id. at¶¶ 132-137, 144. <br /> 12 See 47 C.F.R. § 1.6003. <br /> 13 See 47 C.F.R. § 1.6003(c)(2)and Infrastructure Order at¶114. <br />
The URL can be used to link to this page
Your browser does not support the video tag.