Laserfiche WebLink
City of Pleasanton City Council <br /> February 20, 2019 <br /> Page 4 of 6 <br /> are low-profile, low-power facilities that need to be placed near customers to provide and <br /> improve service. Aesthetic requirements that prohibit installations in large portions of the city <br /> will materially inhibit provision of wireless services, which violates the Telecommunications <br /> Act. <br /> 6. Indemnification. The city should not seek indemnity from an underlying property owner, <br /> as it does under Section 2.5(a)(10). Not only does this risk interfering with existing leases, it also <br /> has the effect of interfering with prospective economic relations between AT&T and property <br /> owners within the city. In addition, the indemnification provisions need to carve out exceptions <br /> to indemnity in instances of the city's own negligence. And AT&T must retain the right to select <br /> its own counsel. <br /> 7. Bond. Section 2.5(a)(11) requires a performance bond to cover facility removal. Both <br /> federal and state law provide that this requirement can only be imposed on wireless providers to <br /> the extent it is applied to other right-of-way users. <br /> 8. Landscaping. The city requires that landscaping, landscape features and street trees must <br /> be restored or replaced when damaged, to which AT&T does not object in Section 2.5(a)(15), <br /> Section 2.7(a)(3) and Section 2.7(b)(14). But the city should not require maintenance of <br /> replacement landscaping, replacement landscape features or replacement street trees, which is <br /> inappropriate. This is unreasonable and the city must eliminate the maintenance requirements. <br /> 9. Cost Reimbursement. Section 2.5(a)(16) states that applicants must"reimburse the city <br /> for all costs incurred in connection with the permit." It also states that the city has the right to <br /> withhold any permits or other approvals unless any outstanding costs have been reimbursed to <br /> the city by the permittee. In addition, Section 2.2(a)(8) also requires applicants to reimburse the <br /> city for the cost of preparing and mailing public notices. These provisions must be revised <br /> because only objectively reasonable costs that are recovered on a nondiscriminatory basis can be <br /> included in fees. AT&T looks forward to working with the city to ensure its proposed fees do not <br /> exceed reasonably cost-based and lawful fees. <br /> 10. Undergrounding. Several provisions in the Proposed Policy mandate undergrounding of <br /> equipment. These requirements must be revised to the extent necessary to avoid unlawful <br /> discrimination or effectively prohibiting wireless services in violation of the Federal <br /> Telecommunications Act of 1996. Wireless facilities cannot operate with all equipment <br /> underground. For example, radio units must be placed above ground in order to be near enough <br /> to the antennas to function properly. Moreover,to comply with state law in Section 7901.1(b), <br /> the city cannot impose undergrounding requirements in a more burdensome way than applied to <br /> other right-of-way users.14 <br /> 11. Electric Meter Upgrades. AT&T objects to Section 2.5(b)(2). Once AT&T installs a <br /> ground-mounted electric meter,the meter is permitted to remain for ten years. AT&T will <br /> discuss removal of a ground-mounted electric meter in the context of a permit renewal. <br /> 14 See also Infrastructure Order at¶86. <br />