My WebLink
|
Help
|
About
|
Sign Out
25
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
041619
>
25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 2:12:01 PM
Creation date
4/10/2019 1:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2019
DESTRUCT DATE
15Y
Document Relationships
25 ATTACHMENT 2e
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\041619
25 ATTACHMENT 4
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\041619
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> CONDITIONS OF APPROVAL <br /> PAP-79, Carl Pretzel and Philip Sayre <br /> PCUP-118/PDR-391,St. Clare's Episcopal Church <br /> 3350 Hopyard Road <br /> September 6,2005 <br /> 1. The construction of the three-phase expansion, totaling 20,845 square feet in building <br /> area with no change in seating capacity in the locations indicated and a parking lot of <br /> 75 parking spaces, shall conform substantially to Exhibit "A" (the revised master <br /> expansion plan and written narrative), dated"Received, August 31, 2005",on file <br /> with the Planning Department,except as modified by the following conditions of <br /> approval. Minor changes to the master expansion plan may be approved by the <br /> Planning Director if found to be in substantial compliance with the proposal. <br /> 2. The construction of Phase I expansion (multi-purpose room and expansion of the <br /> existing worship platform), totaling 4,945 square feet in floor area, shall conform <br /> substantially to Exhibit "A"(the revised master expansion plan, written narrative, <br /> floor plans,elevations, site improvements, and color and material board), dated <br /> "Received, August 31, 2005", on file with the Planning Department, except as <br /> modified by the following conditions of approval. Minor changes to the Phase I <br /> expansion plan may be approved by the Planning Director if found to be in substantial <br /> compliance with the proposal. <br /> 3. The specific design of Phase II expansion(a 10,900-square-foot sanctuary building <br /> with no change in seating capacity and the parking lot expansion to provide a total of <br /> 75 on-site parking spaces)requires design review approval by the Planning <br /> Commission. Said design review application shall include a landscape plan with <br /> sufficient landscaping plantings to buffer the parking lot from the adjacent residential <br /> area and to provide an attractive appearance from National Park Road. <br /> 4. The specific design of Phase III expansion(a 5,000-square-foot administration <br /> building)requires design review approval by the Planning Commission. <br /> 5. The project developer shall pay any and all fees to which the property may be subject <br /> prior to issuance of building permits. The type and amount of the fees shall be those <br /> in effect at the time the building permit is issued. <br /> 6. This master expansion plan for Phases I, II, and III, and the design review approval <br /> for Phase I expansion will lapse within one(1)year from the date of approval unless a <br /> building permit for Phase I is issued and construction has commenced and is <br /> diligently pursued toward completion or an extension has been approved by the City. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.