Laserfiche WebLink
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br />3 <br />2 Mitigation Monitoring and Reporting Plan <br />Impact Mitigation Measure Method of Verification Timing of <br />Verification <br />Responsibility for <br />Verification <br />Verification Complete <br />Date Initial <br />Air Quality <br />Construction associated <br />with implementation of <br />the Proposed Plan would <br />create new sources of <br />fugitive PM10 and PM2.5 <br />dust emissions and ROG <br />emissions, contributing <br />to the nonattainment <br />designation of the <br />SFBAAB for O3, PM2.5, <br />and PM10. <br />AQ-1: Prior to issuance of <br />construction permit, development <br />project applicants that are subject to <br />CEQA and exceed the screening sizes in <br />BAAQMD’s CEQA Guidelines shall <br />prepare and submit to the City of <br />Pleasanton a technical assessment <br />evaluating potential project <br />construction-related air quality impacts. <br />The evaluation shall be prepared in <br />conformance with the BAAQMD <br />methodology in assessing air quality <br />impacts. If construction-related criteria <br />air pollutants are determined to have <br />the potential to exceed the BAAQMD <br />thresholds of significance, as identified in <br />the BAAQMD CEQA Guidelines, the <br />City of Pleasanton shall require that <br />applicants for new development <br />projects incorporate mitigation <br />measures to reduce air pollutant <br />emissions during construction activities <br />to below these thresholds. <br />Submittal of findings <br />and documentation <br />Prior to <br />issuance of <br />construction <br />permit <br />City of <br />Pleasanton <br />Community <br />Development <br />Department