My WebLink
|
Help
|
About
|
Sign Out
PC-2019-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 12:59:57 PM
Creation date
9/26/2019 11:37:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/26/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-16
NOTES
DSP_CERTIFY FEIR FOR DSP UPDATE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br />13 <br />Impact Mitigation Measure Method of Verification Timing of <br />Verification <br />Responsibility for <br />Verification <br />Verification Complete <br />Date Initial <br />Boulevard at Valley <br />Avenue/ Junipero Street <br />extending beyond the <br />available storage in the <br />AM peak hour in the <br />cumulative with project <br />condition. <br />proposed. City shall <br />require payments of <br />Transportation <br />Impact Fees as <br />applicable. <br />Traffic <br />Engineering <br />Division <br />Construction of bicycle <br />facilities proposed by the <br />Proposed Plan would <br />not be consistent with <br />the bicycle facilities <br />contemplated for the <br />downtown area in the <br />City’s Bicycle and <br />Pedestrian Master Plan. <br />TRA-9: Conduct a feasibility study for <br />the proposed bicycle and pedestrian <br />facilities in the Proposed Plan. Should <br />the facilities be deemed feasible, amend <br />the City’s Bicycle and Pedestrian Master <br />Plan to reflect the bicycle and pedestrian <br />improvements included in the Proposed <br />Plan. Should improvements been <br />deemed infeasible, amend the Proposed <br />Plan. <br />City shall conduct a <br />feasibility study for <br />the proposed <br />bicycle and <br />pedestrian facilities. <br />City shall amend <br />either the City’s <br />Bicycle and <br />Pedestrian Master <br />Plan or the <br />Proposed Plan to <br />reflect the findings <br />of the study. <br />Immediately <br />following <br />approval of <br />Downtown <br />Specific Plan <br />City of <br />Pleasanton <br />Community <br />Development <br />Department, <br />Traffic <br />Engineering <br />Division
The URL can be used to link to this page
Your browser does not support the video tag.