Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> superseded by the 2019 recirculated Health Risk Assessment, and is therefore no longer required <br /> and is shown in stfikethrouglt text(see page 5-4). <br /> 5.2 Format <br /> The MMRP is organized in a table format(see Table 5-1), keyed to each significant impact and <br /> each SEIR mitigation measure. Only mitigation measures adopted to address significant impacts <br /> are included in this program. Each mitigation measure is set out in full,followed by a tabular <br /> summary of monitoring requirements. The column headings in the tables are defined as follows: <br /> • Mitigation Measures adopted as Conditions of Approval: This column presents the <br /> mitigation measure identified in the SEIR. <br /> • Site(s)Affected: The mitigation measures are, in some cases, site specific.This column <br /> identifies which specific sites would need to adhere to the mitigation measure,or states that <br /> the measure addresses all sites. <br /> • Implementation Procedures: This column identifies the procedures associated with <br /> implementation of the mitigation measure. <br /> • Monitoring Responsibility: This column contains an assignment of responsibility for the <br /> monitoring and reporting tasks. <br /> • Monitoring and Reporting Action: This column refers the outcome from implementing <br /> the mitigation measure. <br /> • Mitigation Schedule: This column shows the general schedule for conducting each <br /> mitigation task, identifying both the timing and the frequency of the action,where <br /> appropriate. <br /> • Verification of Compliance: This column may be used by the City,as Lead Agency,to <br /> document the person who verified the implementation of the mitigation measure and the <br /> date on which this verification occurred. <br /> 5.3 Enforcement <br /> If the EDZ is approved,the MMRP would be incorporated as a condition of such approval. <br /> Therefore,all mitigation measures for significant impacts must be carried out to fulfill the <br /> requirements of approval.A number of the mitigation measures would be implemented during the <br /> development review process.These measures would be checked on plans, in reports,and in the <br /> field before construction. Most of the remaining mitigation measures would be implemented <br /> during the construction or EDZ implementation phase. <br /> Johnson Drive Economic Development Zone 5-2 ESA/140421 <br /> Partial Recirculated Draft SEIR Response to Comments January 2020 <br />