Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting ! Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.A.Aesthetics <br /> None required. <br /> 4.B.Air Quality <br /> �Newmeasum added in 2019 Partial Recirculated Draft SEIR All Site developer shall Site developer Verify inclusion of contract Prior to issuance Verified by.' <br /> Mitigation Measure M-AQ-1:Construction Emissions include contractors' Community specifications. of grading or Date: <br /> Minimization.The project sponsor or the project sponsor's contractor contract specifications. j Development Inspect site during construction building permit, <br /> shall comply with the following: Department to ensure compliance with whichever is first. <br /> 1. All off-road equipment(including water construction equipment contract specifications. Field inspections <br /> used onboard barges)greater than 50 horsepower shall have during <br /> engines that meet Tier 3 off-road emission standards. construction. <br /> 2. Diesel engines,whether for off-road or on-road equipment,shall <br /> not be left idling for more than two minutes,at any location, <br /> except as provided in exceptions to the applicable state <br /> regulations regarding idling for off-road and on-road equipment <br /> (e.g.,traffic conditions,safe operating conditions).The contractor <br /> shall post legible and visible signs in English,Spanish,and <br /> Chinese, in designated queuing areas and at the construction site <br /> to remind operators of the two-minute idling limit. <br /> 3. The contractor shall instruct construction workers and equipment <br /> operators on the maintenance and tuning of construction equipment, <br /> and require that such workers and operators properly maintain and <br /> tune equipment in accordance with manufacturer specifications. <br /> Mitigation Measure 4.B-1:All developers of sites within the EDZ area All Site developer shall Site developer Verify inclusion of BMPs in Prior to issuance Verified by: <br /> shall ensure that construction plans include a requirement that the include BAAQMD BMPs Community applicable construction plans of grading or Date: <br /> BAAQMD Best Management Practices for fugitive dust control be in construction plan. Development and specifications;field building permit, <br /> implemented.All developers of sites within the EDZ area are required Department inspections during construction. whichever is first. <br /> to implement the following for all construction activities within the EDZ Inspect site during construction Field inspections <br /> area,to reduce fugitive dust emissions that would be generated to ensure compliance with during <br /> primarily during soil movement,grading,and demolition activities,but project construction plans. construction. <br /> also during vehicle and equipment movement on unpaved <br /> construction sites: <br /> 1. All exposed surfaces(e.g.,parking areas,staging areas,soil piles, <br /> graded areas,and unpaved access roads)shall be watered two <br /> times per day. <br /> 2. All haul trucks transporting soil,sand,or other loose material off-site <br /> shall be covered. <br /> 3. All visible mud or dirt track-out onto adjacent public roads shall be <br /> removed using wet power vacuum street sweepers at least once <br /> per day.The use of dry power sweeping is prohibited. <br /> Johnson Drive Economic Development Zone 5-3 ESA/140421 <br /> Partial Recirculated Draft SEIR Response to Comments January 2020 <br />