Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring ' Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 1 I ; <br /> 4.E•1.Biological Resources <br /> (2012 SEIR)Modified Mitigation Measure 4.0-la:Pre- 4-4- Site developer shall Site developer Review and approve a qualified No more than 14 Verified by: <br /> construction Breeding Bird Surveys.The City shall ensure that 6 11, 13, 14, prepare construction Community biologist. days before start Date: <br /> prior to development of all potential sites for rezoning(Sites 1 4,6 16 21 plans that incorporate Development Review pre-construction survey or restart of <br /> 11, 13, 14, and 46-24)and each phase of project activities that have All(Phase I pre-construction surveys Department reports. construction <br /> the potential to result in impacts on breeding birds(e.g.,tree removal and Full and buffer zones.If during the months <br /> If active nests are found, <br /> or demolition of buildings or bridges),the project applicant shall take Buildout) required,avoidance of February <br /> the following steps to avoid direct losses of nests,eggs, and nestlings procedures shall be inspect construction site to through August. <br /> and indirect impacts to avian breeding success: implemented. confirm buffer zones. <br /> • If grading or construction activities occur only during the non- Site developer shall hire <br /> breeding season,between August 31 and February 1,no surveys a qualified biologist and <br /> will be required. the site developer's <br /> • Pruning and removal of trees and other landscaped vegetation, contractor(s)shall <br /> including grading of grasslands,should occur whenever feasible, engage the qualified <br /> outside the breeding season(February 1 through August 31). biologist to conduct pre- <br /> construction surveys as <br /> • During the breeding bird season(February 1 through August 31) described. <br /> a qualified biologist will survey project sites for nesting raptors <br /> and passerine birds not more than 14 days prior to any ground- <br /> disturbing activity or vegetation removal.Surveys will include all <br /> line-of-sight trees within 500 feet(for raptors)and all vegetation <br /> within 250 feet for all other species. <br /> • Based on the results of the surveys,avoidance procedures will be <br /> adopted,if necessary,on a case-by-case basis.These may <br /> include construction buffer areas(up to several hundred feet in <br /> the case of raptors)or seasonal avoidance. <br /> • Bird nests initiated during construction are presumed to be <br /> unaffected by project activities,and no buffer would be necessary <br /> except to avoid direct destruction of a nest or mortality of <br /> nestlings. <br /> • If pre-construction surveys indicate that nests are inactive or <br /> potential habitat is unoccupied during the construction period,no <br /> further mitigation is required if work is initiated within 14 days of <br /> the survey.Trees and shrubs that have been determined to be <br /> unoccupied by nesting or other special-status birds may be <br /> pruned or removed within 14 days of the pre-construction survey. <br /> Should activities be delayed beyond 14 days,pre-construction <br /> surveys shall be repeated prior to the start of work. <br /> Johnson Drive Economic Development Zone 5-11 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />