5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> i I <br /> 4.E-1.Biological Resources(cont.) <br /> Mitigation Measure 4.E-1: Pre-Construction Bat Surveys. All sites Site developer shall Site developer Verify inclusion of condition on Prior to issuance Verified by: <br /> Conditions of approval for building and grading permits issued for where prepare constructionEngineering construction plans. If large trees of grading or Date: <br /> demolition and construction on sites within the EDZ area shall include buildings shall plans that incorporate Department are to be removed or if vacant building permit, <br /> a requirement for pre-construction special-status bat surveys when be pre-construction surveys buildings are to be demolished, whichever is <br /> large trees constituting suitable habitat for roosting bats(e.g.trees demolished or and buffer zones.If review and approve qualified sooner. <br /> with cavities or trees with bark that could be used for roosting such as large trees required,avoidance biologist, pre-construction Inspect site during <br /> eucalyptus and redwood)are to be removed or underutilized or constituting procedures shall be survey reports,and a construction to <br /> vacant buildings are to be demolished, suitable implemented. construction plan that includes ensure <br /> • Surveys shall be conducted by a qualified biologist prior to any tree habitat for Site developer shall hire a bat avoidance. compliance with <br /> removal or building demolition.Removal of trees and structures roosting bats qualified biologist and the Inspect construction site to project <br /> shall occur when bats are active,approximately between the shall be site developers confirm buffer zones, if construction <br /> periods of March 1 to April 15 and August 15 to October 15;outside removed. contractor(s)shall required. plans. <br /> of bat maternity roosting season(approximately April 15—August engage the qualified <br /> 31)and outside of months of winter torpor(approximately October biologist to conduct pre- <br /> 15—February 28),to the extent feasible. construction surveys as <br /> • If removal of trees and structures during the periods when bats are described. <br /> active is not feasible and active bat roosts being used for maternity <br /> or hibernation purposes are found on or in the immediate vicinity of <br /> the site where tree and structure removal is planned,a no <br /> disturbance buffer of 100 feet shall be established around these <br /> roost sites until they are determined to be no longer active by the <br /> qualified biologist.A 100-foot no disturbance buffer is a typical <br /> protective buffer distance;however,buffer width may be modified by <br /> the qualified biologist depending on existing screening around the <br /> roost site(such as dense vegetation or a building)as well as the <br /> type of construction activity which would occur around the roost site. <br /> • The qualified biologist shall be present during tree and structure <br /> removal if potential bat roosting habitat or active bat roosts are <br /> present.Trees and structures with active roosts shall be removed <br /> only when no rain is occurring or is forecast to occur for 3 days and <br /> when daytime temperatures are at least 50°F. <br /> • Removal of trees with potential bat roosting habitat or active bat <br /> roost sites shall follow a two-step removal process: <br /> 1. On the first day of tree removal and under supervision of the <br /> qualified biologist, branches and limbs not containing cavities <br /> or fissures in which bats could roost,shall be cut only using <br /> chainsaws. <br /> 2. On the following day and under the supervision of the qualified <br /> biologist,the remainder of the tree may be removed,either using <br /> chainsaws or other equipment(e.g.excavator or backhoe). <br /> Johnson Drive Economic Development Zone 5-12 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />