Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.E-1.Biological Resources(cont.) <br /> • The City shall ensure that the temporary fencing is continuously <br /> maintained until all construction activities are completed. <br /> A fencing material meeting the requirements of both water quality <br /> protection and wildlife exclusion shall be used. <br /> Mitigation Measure 4.E-4:Compensation for Impacts to Wetlands All City or Caltrans shall Site developer RWQCB/USACE.;Review, Prior to issuance Verified by: <br /> and Other Waters.Where jurisdictional wetlands and other waters obtain relevant permits Caltrans verify wetland delineation. of grading or i Date: <br /> cannot be avoided,to offset temporary and permanent impacts that as listed. buildingpermit, <br /> p ry p San Francisco Community Development <br /> would occur as a result of the bridge expansion and replacement, City or Caltrans shall Regional Water Department/Caltrans:Review whichever is first. <br /> restoration and compensatory mitigation shall be provided through complete wetlands Qand approval of construction <br /> the following mechanisms: compensation. Board ard rdy Control papp plan. <br /> • Prior to construction,the City or Caltrans shall obtain relevant (RWQCB) Community Development <br /> permits and authorizations from the U.S.Army Corps of Engineers Department/Caltrans:Inspect <br /> (USAGE),California Department of Fish and Wildlife(CDFW),and U.S.Army <br /> the San Francisco BayRegional Water QualityControl Board Corps of site during construction to <br /> g Engineers ensure compliance with project <br /> (RWQCB); (USACE) construction plans. <br /> • Consistent with the terms and conditions of these permits and <br /> authorizations,the City or Caltrans shall compensate for the California <br /> unavoidable loss of wetlands and other waters at a minimum of a Department of <br /> 1:1 ratio;and Fish and <br /> Wildlife <br /> • Compensation may be provided by one or more of the following (CDFW) <br /> methods: 1)on-site creation or habitat restoration,2)off-site habitat <br /> creation,restoration and/or enhancement,or 3)payment to an Community <br /> approved wetland mitigation bank. Development <br /> Department <br /> Mitigation bank credits, if available,shall be obtained prior to the start <br /> of construction. On-site or off-site creation/restoration/enhancement <br /> plans must be prepared by a qualified biologist prior to construction <br /> and approved by the permitting agencies. Implementation of <br /> creation/restoration/enhancement activities by the permittee shall <br /> occur prior to impacts,whenever possible,to avoid temporal loss.On- <br /> or off-site creation/restoration/enhancement sites shall be monitored <br /> by the City for at least five(5)years to ensure their success. <br /> Johnson Drive Economic Development Zone 5-14 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />