Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility . Action Schedule 11 Compliance <br /> 4.E-2.Cultural Resources <br /> Mitiggation Measure 4.E-5:Archeological Resources.If prehistoric All Site developer shall hire Site developer Review and approval of T <br /> Prior to issuance Verified by: <br /> or historic-period archaeological resources are encountered during a qualified archaeologist Community archaeologist. Review and of grading permit. Date: <br /> ground disturbing activities for a project under construction within the to prepare an Development approval of the construction Field inspections <br /> EDZ,the construction contractor shall halt all activities within 50 feet archaeological Department plan that includes during <br /> of the discovery,and the construction contractor shall notify the City. mitigation program as archaeological mitigation. construction. <br /> Prehistoric archaeological materials might include obsidian and chert described. Inspect site during construction. <br /> flaked-stone tools(e.g., projectile points, knives,scrapers)or <br /> toolmaking debris;culturally darkened soil("midden")containing heat- <br /> affected rocks,artifacts, or shellfish remains;stone milling equipment <br /> (e.g.,mortars,pestles, handstones,or milling slabs); and battered <br /> stone tools,such as hammerstones and pitted stones. Historic-period <br /> materials might include stone,concrete,or adobe footings and walls; <br /> filled wells or privies; and deposits of metal,glass,and/or ceramic <br /> refuse.The project developer shall ensure that a Secretary of the <br /> Interior—qualified archaeologist will inspect the findings within 24 <br /> hours of discovery. If the archaeologist determines that construction <br /> activities could damage a historical resource or a unique <br /> archaeological resource(as defined pursuant to the CEQA <br /> Guidelines),mitigation will be implemented in accordance with Public <br /> Resources Code(PRC)Section 21083.2 and Section 15126.4 of the <br /> CEQA Guidelines,with a preference for preservation in place. <br /> Consistent with Section 15126.4(b)(3),this may be accomplished <br /> through planning construction to avoid the resource; incorporating the <br /> resource within open space;capping and covering the resource; or <br /> deeding the site into a permanent conservation easement. If <br /> avoidance is not feasible,a qualified archaeologist will prepare and <br /> implement a detailed treatment plan in consultation with the City. <br /> Treatment of unique archaeological resources shall follow the <br /> applicable requirements of PRC Section 21083.2.Treatment for most <br /> resources would consist of(but would not be not limited to)sample <br /> excavation, artifact collection,site documentation,and historical <br /> research,with the aim to target the recovery of important scientific <br /> data contained in the portion(s)of the significant resource to be <br /> impacted by project construction.The treatment plan will include <br /> provisions for analysis of data in a regional context, reporting of <br /> results within a timely manner,curation of artifacts and data at an <br /> approved facility,and dissemination of reports to local and state <br /> repositories,libraries,and interested professionals. <br /> Johnson Drive Economic Development Zone 5-15 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />