Laserfiche WebLink
Figure 3: Parcels Approved by PUD-97-21 <br /> ....i.._r_ I 1 <br /> j <br /> Parcel 2 <br /> /0„,,. .-4" <br /> Parcel 1 <br /> PUD 97-21 also assumed the relocation of a multi-use trail, shown in the NSSP as following <br /> the alignment of Sycamore Creek through the subject property. The PUD approvals described, <br /> but did not map, a realignment of the trail to follow Dale Way to Sycamore Road, with the final <br /> design and alignment of this trail to be determined prior to recordation of the Final Map.1 <br /> Ultimately, the property owner did not record the Final Map, and the PUD approval expired in <br /> May 2000. In 1998 the property was acquired by the current applicant, the Bringhursts. <br /> Bridle Creek and Sycamore Heights Developments <br /> In March 1998, the City Council approved PUD 97-03, for Greenbriar Homes' Bridle Creek <br /> development, which included 111 single-family homes on a combined 56.2-acre site, west of <br /> 990 Sycamore Road (see Figure 1). The project was required to construct sanitary sewer and <br /> water line extensions that also benefited 990 Sycamore Road. In October of 1999, the City <br /> Council approved PUD 97-12 for Summerhill Homes' Sycamore Heights development, which <br /> had 48 single-family homes on a combined 34.65-acre site, located to the north of 990 <br /> Sycamore Road. <br /> In November 2002, the City approved lot line adjustments (CCAs) between the Bringhurst <br /> property and parcel(s) to the north, then owned by New Cities and later acquired by <br /> Summerhill Homes. The LLAs allowed for a more logical parcel configuration and <br /> accommodated the proposed alignment for Sycamore Creek Way to be constructed by <br /> Greenbriar, discussed in more detail below. The subject lot's current configuration is shown in <br /> Figure 4. <br /> ' At the time, this private road provided access from Sycamore Road to several large lot properties to the north, <br /> and to the City's Sycamore water tank to the east. <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 5 of 23 <br />ot been constructed, and the property was not <br /> served by City water and sewer. Since the project, by itself, would not construct the necessary <br /> access and utility improvements, PUD-97-21 was conditioned to not allow recordation of a final <br /> map until the roadway and utilities were installed, with the PUD approval to lapse two years <br /> after the utility and roadway improvements were made, unless a Final Map was recorded. <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 4 of 23 <br />hts <br /> development; on the east by Sycamore Heights and the Jensen property at 994 Sycamore <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 3 of 23 <br /><br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 2 of 23 <br />ndicating trenching will not be detrimental to the health of <br /> the tree. <br /> c. Nothing may be stored within the dripline of the tree canopies. This includes equipment, <br /> oil, gas, chemicals, harmful materials, fill or storage. <br /> d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or disposed <br /> within the dripline of the trees or in drainage channels, swales, or areas that may lead to <br /> the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 20 of 21 <br />PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 19 of 21 <br />type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />