My WebLink
|
Help
|
About
|
Sign Out
5_Exhibits A-G
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2020
>
05-27
>
5_Exhibits A-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:27:16 PM
Creation date
5/20/2020 3:26:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/27/2020
Document Relationships
5
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2020\05-27
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Planning Commission questioned and was concerned about the City's prior decision to <br /> allow site grading and stubbing of utilities prior to receiving project approvals, and that more <br /> utility laterals had been allowed than the number of residential lots/homes permitted by the <br /> NSSP. Although no formal vote was taken, in discussion, the majority of the Commission was <br /> supportive of the potential NSSP amendment and allowing some additional development on <br /> this property, seeing it as a way to logically continue the now-established development pattern <br /> along Sycamore Creek Road. The Commission indicated the three lots/homes fronting <br /> Sycamore Creek Way would need to have comparable lot sizes and similar setbacks and <br /> architecture/design as the homes in the Sycamore Heights development and to provide an <br /> appropriate transition between new lots and existing lots fronting Sycamore Creek Way at <br /> either end of the site, noting that the lot size and setback varied between the lots to the east <br /> and to the west. <br /> Following the 2008 workshop, no further action was taken by the applicant to pursue the <br /> development of the site until the current submittal. <br /> July 11, 2018, Planning Commission Work Session <br /> In order to receive early feedback from the Planning Commission and any interested <br /> individuals regarding the proposed project, a Planning Commission work session was held on <br /> July 11, 2018. <br /> After taking public testimony, the Planning Commission provided the following comments on <br /> the work session discussion points (additional comments made by the Commission are in the <br /> attached minutes — Exhibit C): <br /> 1. Would the Planning Commission support the requested NSSP amendments including <br /> the following: <br /> a. Amending the land use designation for a one-acre portion of the site, from PUD- <br /> A to PUD-LDR, to allow the site to be developed with five lots instead of three: <br /> b. Amending the NSSP text to allow one of the PUD-A lots to be less than an acre <br /> in size, so the creek can be located within one of the two PUD-A parcels; <br /> c. Realigning the multi-use trail as shown in Figure 5; <br /> If not, is some alternative number of lots (more than three) or lot configuration more <br /> appropriate? (Alternatives include, for example, two lots fronting Sycamore Creek Way <br /> and two to the south; or three lots along Sycamore Creek Way, and a single large lot to <br /> the south)? <br /> The Commission was not unanimous in supporting the five-lot proposal. The Commission <br /> supported the three lots along Sycamore Creek Way and found the proposed 15,000-lot- <br /> size is appropriate and compatible with the neighborhood. As for the proposed lot front <br /> Sycamore Road, the Commission wanted to ensure, with the new lot, the existing rural <br /> character would be maintained. Commission suggested photo simulations be included in <br /> the formal application submittal which would show the massing of the proposed home in <br /> context with the existing neighborhood. The Commission indicated it could support the trail <br /> realignment. <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 8 of 23 <br />tree canopies. This includes equipment, <br /> oil, gas, chemicals, harmful materials, fill or storage. <br /> d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or disposed <br /> within the dripline of the trees or in drainage channels, swales, or areas that may lead to <br /> the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 20 of 21 <br />PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 19 of 21 <br />type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />