Laserfiche WebLink
2. If the Planning Commission supports a Specific Plan amendment for density increase, <br /> should the applicant be required to provide additional amenities beyond those required <br /> for a three-lot subdivision? If yes, what amenities should be considered? <br /> The Commission indicated amenities should be required for a specific plan amendment <br /> for any additional density. The Commission agreed that the amenities could be in the <br /> form of funding City projects such as in the bike and pedestrian master plan that deal <br /> with connectivity, especially in south Pleasanton area. The Commission encouraged the <br /> applicant to work with staff on finding amenity contribution. <br /> 3. If the proposed specific plan amendment is supportable, does the Commission support <br /> staff's other recommendations with respect to the project including: <br /> a. Requirement for PUD-LDR lots to conform to a 15,000 square foot minimum. <br /> b. Reduction of proposed FARs to be more consistent with adjacent development. <br /> c. Regrading of the site to make future pad heights more compatible with adjacent <br /> lots. <br /> d. Modifying the trail design to be a minimum 12 foot-wide, multi-use facility, <br /> consistent with the existing trail. <br /> The Commission supported the lots fronting Sycamore Creek Way to have a lot size in <br /> the range of 14,000 -15,000 square feet, the future homes to have similar setbacks, <br /> floor area, and height as the existing homes in the neighborhood. The Commission <br /> agreed the pad heights of the new lots need to be compatible with adjacent lots, and <br /> excessive soil from project grading needs to be off hauled instead of stockpiling it on the <br /> project site. Regarding the trail, the Commission concurred with staff 's recommendation <br /> to match the existing trail and did not have additional comments. <br /> 4. What other information would assist the Planning Commission in its decision on the <br /> proposed project (e.g., additional photo simulations, additional technical reports or other <br /> information)? <br /> Commission indicated that they would like to see a detailed visual where the exact <br /> building elements would be located and visible along Sycamore Road; a streetscape <br /> visual to assist in understanding FAR, and appropriate setbacks in respect to Sycamore <br /> Creek. <br /> Changes Since July 2018 Work Session <br /> Land Use Designation and Zoning Category of the Site <br /> Staff originally recommended that if the property was to be rezoned, that the northern three <br /> parcels be designated PUD-LDR. This was principally out of concern that the MDR designation <br /> implies a higher density than allowed under LDR, and might lead a future owner to assume <br /> that the lots could be further divided. Though the proposed three lots would technically exceed <br /> the typical 2 dwelling units/acre (DUA) density allowable in the LDR designation, at the time <br /> staff felt that an appropriate interpretation could be made to support the designation, using the <br /> flexibility allowed by the PUD to take the approach of averaging it across the entire site . <br /> However, upon further consideration and discussion, staff concluded that the Medium Density <br /> Residential (MDR) designation in fact makes more sense, with a clear Condition of Approval <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 9 of 23 <br />ipline of the trees or in drainage channels, swales, or areas that may lead to <br /> the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 20 of 21 <br />PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 19 of 21 <br />type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />