Laserfiche WebLink
the project site from its current terminus at the Bridle Creek development to head south along <br /> Dale Way, and then turn east along the property frontage on Sycamore Road to be connected <br /> to the Alisal Trail which may be constructed by another development. To implement the <br /> proposed trail realignment, a 25-foot wide trail easement would be created parallel to <br /> Sycamore Road on Lot 1. This extra width is needed to accommodate any necessary <br /> meandering of the trail to avoid obstacles (e.g., in one section, it needs to meander around an <br /> existing oak). Figure 7 illustrates the proposed realignment. Since the trail would need to <br /> cross the driveway serving the site but located on adjacent private property, striping or some <br /> other form of delineation would indicate the pedestrian path of travel. <br /> Figure 7: Proposed Trail Realignment <br /> Existing Trail at ��? . :3 <br /> Bridle Creek Development C - :! . <br /> I <br /> „ . �;1 (\ I a ' <br /> s. <br /> �_ �` d ' <br /> M <br /> ' ` SSP F ., af <br /> iannent <br /> I' - ,, ', ti. _Proposed Tra3 k, , <br /> Alignment , .a t' <br /> x _ }; <br /> a <br /> . 6.7,, , ,e, . -. _it , <br /> ,,,,.,„ .„-,s,„...e,,.., - :,-, r ' ---- .------ : -..,t -- ' ' ,e,...,i <br /> ,...,41.„.„z •-.* ,..„_,...:„!::.. .„,,....„. .1..,, .. ,.,••*,..„. ., 14Nor..„:„.,,, ...- : k ,., ... , , , <br /> • <br /> !f'J <br /> • . ,. . _,,,,,, .! tii ,,,,... - 'tzt..r.ii,.......- -..° ,,„i, --- - .,-.-,:t. .* ,topA„i; ''..i . ., .' <br /> 9 — . <br /> - Proposed Striping Across <br /> the Driveway <br /> Proposed Alisal Trail by ' _ <br /> Mr' Another Devel p ent <br /> ui4 rT a-r <br /> ANALYSIS <br /> The analysis below is provided based on the proposed 5-lot residential development. As noted <br /> in the Executive Summary section, staff does not support the NSSP amendment to increase <br /> density, or the related re-zoning, PUD Development Plan, and Vesting Tentative Map for this <br /> project. <br /> Land Use and Density <br /> The project site has a General Plan Land Use designation of"Low Density Residential” on the <br /> General Plan Map. However, the General Plan Land Use Element indicates that General Plan <br /> Land Uses, densities and street alignments that are within specific plan areas are only <br /> conceptually shown on the General Plan Map while the Specific Planprovides additional detail. <br /> Therefore, the proposed development will need to conform to the Land Use Designation and <br /> density indicated by the NSSP. <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 12 of 23 <br /> <br /> 990 Sycamore Road Planning Commission <br /> 10 of 23 <br />g units/acre (DUA) density allowable in the LDR designation, at the time <br /> staff felt that an appropriate interpretation could be made to support the designation, using the <br /> flexibility allowed by the PUD to take the approach of averaging it across the entire site . <br /> However, upon further consideration and discussion, staff concluded that the Medium Density <br /> Residential (MDR) designation in fact makes more sense, with a clear Condition of Approval <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 9 of 23 <br />ipline of the trees or in drainage channels, swales, or areas that may lead to <br /> the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 20 of 21 <br />PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 19 of 21 <br />type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />