Laserfiche WebLink
Trail Design <br /> The NSSP does not include design standards for the public trail, but Figure VI-1 in the Specific <br /> Plan shows a conceptual design for improvements along Sycamore Creek, including a 12-foot <br /> wide "multi-use all weather accessway." The existing trail located on the west side on project <br /> site (Dale Way) has a decomposed granite surface, and staff at the work session suggested <br /> the trail included in the application should match the existing trail. Since the July 2018 work <br /> session, in May 2019, the City Council adopted the Trails Master Plan. The master plan shows <br /> a future Class 1 trail to be constructed at the project site along Sycamore Road. This future <br /> trail is comprised of a 10'-20' (8' min.) wide trail with asphalt or concrete surface and a 1- to 2- <br /> foot wide fine crushed stone shoulder on each side. <br /> The proposal includes a trail along the frontage of Lot 1 . It includes a 10-foot wide paved trail <br /> with a 2-foot wide decomposed granite shoulder on either side of the trail and a 5-foot wide <br /> landscape stripe between the northern right-of-way line of Sycamore Road and the 2-foot wide <br /> shoulder. It conforms to the Trails Master Plan. meeting the requirements of the trails master <br /> plan. The plan also shows a connection linking Dale Way to the existing Bridle Creek trail. <br /> Grading and Retaining Walls <br /> As proposed, the PUD-MDR lots would have access to and from Sycamore Creek Way, and <br /> the PUD-A lot would have access to Sycamore Road. As recommended by staff and supported <br /> by Planning Commission in the work session, the grading plan has been revised to address <br /> the following items: <br /> 1 . Grading on Lot 2 has been revised so that the proposed pad elevation on Lot 2 would <br /> be approximately 3 feet higher than the pad elevation of the adjoining lot to the west. <br /> The revision lowered the pad elevation approximately 3-4 feet compared to the initial <br /> proposal. This grade difference is similar to that seen between other lots in the adjacent <br /> subdivision. <br /> 2. Excessive dirt from grading of the project site would be off-hauled instead of stock-piled <br /> onto Lot 1 , the proposed PUD-A lot fronting Sycamore Road. <br /> Staff finds the proposed grading plan responded to the comments made at the work session. <br /> Should the Planning Commission support a version of the project that includes a configuration <br /> similar to that proposed, the grading would, in staff's view, be acceptable. <br /> Retaining walls are proposed on Lots 2-4, and between Lots 2-3 and Lot 5. Should the <br /> Planning Commission support a version of the project similar to that proposed, staff finds the <br /> proposed retaining walls would be acceptable except for the location of the wall between Lots <br /> 2-3 and Lot 5. This wall, as proposed, is located on Lot 5 but benefits Lots 2-3. It is standard <br /> practice, and prudent from a liability and maintenance standpoint, to have the benefitting <br /> property owners responsible for the maintenance of a retaining wall. As such, for this or a <br /> similar lot configuration, staff would recommend either: <br /> 1 . Relocating the wall from Lot 5 to Lots 2 and 3; or, <br /> 2. Adjusting the rear property line of Lots 2 and 3 to include the wall. <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 19of23 <br />k on the project site is approximately 6,008 square <br /> feet (creek bank to creek bank) in area. Even if the entire segment of the creek were placed on <br /> PUD-135, P19-0030, P19-0031 and Vesting Tentative Map 8528 <br /> 990 Sycamore Road Planning Commission <br /> 16 of 23 <br />5, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 19 of 21 <br />type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />