My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32. <br /> <br />organization lo assume that responsibility. The management entity shall be selected <br />based on its ~mancial and technical capability to carry out the long-term maintenance <br />requirements and its commitment to goals consistent with the long-term maintenance. <br />Selection of lhe management entity shall be subject to approval by the COE and the <br />County. If ai management entity is approved, the management entity, through a legally <br />binding agre4ment, shall assume the maintenance and management responsibility of the <br />wetland mitigation areas in perpetuity. <br /> <br />The operatori shall avoid existing ponds in the Phase I landfill area until replacement <br />wetlands have been established. The operator may remove the existing ponds as <br />construction 9ccurs in the expansion area after it has been determined that replacement <br />wetlands have been established and the California tiger salamander has been resettled. <br /> <br />ALKALI SINK <br /> <br />33. <br /> <br />The operatori shall implemem a mitigation plan for the alkali sink that is based on the <br />Conceptual Wetlands Mitigation Plan (LSA, 1994) and the mitigation measures identified <br />in the FEIR, and that has been approved by the COE, DFG, FWS, and the County. <br />Operator shall conduct a site-specific hydrology analysis for the sink to determine the <br />appropriate a~/erage seasonal flow to the sink, and this shall be incorporated into the plan. <br />The mitigation plan shall include performance and monitoring standards. <br /> <br />34. <br /> <br />35. <br /> <br />The operator shall conduct bi-annual monitoring of the alkali sink pursuant to a <br />monitoring p!an approved the COE, DFG, FWS, and the County to determine whether the <br />performance ~tandards are being met. If the monitoring reports show that the alkali sink <br />is not being iadequately maintained or is declining in habitat quality or quantity, the <br />operator shall take additional mitigation measures approved by the COE, FWS, DFG, and <br />the County, based in part on measures recommended in the FEIR. <br /> <br />Any surface pr ground water delivered to the alkali sink shall pass through detention <br />basins to remove sediment, and untreated leachate delivered into the alkali sink shall <br />meet applicalSle water quality standards. <br /> <br />36. The operator )hall fence the area to keep livestock out of the alkali sink. <br /> <br />GEOLOGY/SOILS/~EISMIC <br /> <br />37. The operator!shall design and construct the landfill in accordance with Titles 14 and 23 <br /> of the California Code of Regulations (CCR) requirements for final cover design, final <br /> surface grades, and continuing monitoring and maintenance to reduce potential impacts <br /> due to settlement. The final design and subsequent modifications shall be reviewed by <br /> the RWQCB !(prior to issuance of revised Waste Discharge Requirements) and the LEA <br /> (as part of the application for a revised Solid Waste Facilities Permit). RWQCB and <br /> LEA approvals shall signify that the proposed design meets all of the applicable <br /> requirements.i <br /> <br />38. <br /> <br />The operatorl shall conduct slope stability analyses for the design in accordance with <br />Titles 14 and 23 of the CCR and stability shall be verified for each landfill cell and <br /> <br />14-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.