My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39. <br /> <br />40. <br /> <br />41. <br /> <br />42. <br /> <br />43. <br /> <br />excavation. ~he analyses would be able to address hidden instability conditions on the <br />site. The purpose of the analyses shall be to determine potential hazards for cut slopes, <br />refuse slopeS, and final cover. Measures shall be implemented to reduce specific <br />identified slope instability hazards. These measures might include reducing the slope <br />angle, keying slopes, buttressing unstable areas and excavation sequencing from higher- <br />lying to lower-lying parts of unstable slopes. Similar verification shall occur for <br />temporary refuse fill slopes for future fill sequences prior to construction of each cell. <br />All slope stability investigations shall be conducted by a certified engineering geologist <br />and/or registered geotechnical engineer. All final grading plans and slope stability <br />analyses shall be reviewed by the County Grading Inspector prior to the start of liner <br />construction. <br /> <br />The proposed final topography shall be described in the Report of Disposal Site <br />Information that would be submitted to the LEA as part of the application for a revised <br />Solid Waste Facilities Permit. The LEA's approval of the application shall signify that <br />the proposed topography meets all of the applicable Title 14 requirements. <br /> <br />The operator shall establish permanent survey monuments on and in the immediate <br />vicinity of the landfill to monitor long-term landfill settlement or lateral displacement. <br />The monum{nts shall be periodically surveyed during the post-closure maintenance <br />period. If the monitoring of settlement and displacement detects that more than <br />anticipated amounts of movement of the monuments has occurred, an engineer or <br />engineering geologist shall be retained to make specific recommendations for correcting <br />the stability Problem. A record of the monument survey results shall be filed with the <br />LEA. <br /> <br />During the landfill development period, the operator's engineer shall conduct an <br />investigation Cf slope stability, including active working area, filled and closed areas, and <br />nearby areas that could affect the landfill whenever there is rainfall of more than six <br />inches in a three-day period that follows an accumulated seasonal (October through <br />April) total rainfall of 15 or more inches. <br /> <br />The operator ?hall retain a qualified engineering geologist to conduct a site inspection to <br />identify any Ipotential indications of instability and to provide recommendations to <br />stabilize or m~nimize hazards of slope instability as soon as possible, but not longer than, <br />one week following such a rainfall. A record of the engineering geologist's inspection <br />and recomme~adations, and the operator's response plan shall be filed with the LEA and <br />RWQCB. <br /> <br />All offsite si}ope instabilities that could reasonably affect the landfill and perimeter <br />drainage system shall be identified by an engineering geologist and corrected at the time <br />that filling is carried out in that part of the Expansion area. At the time of the final <br />closure plan, ho significant slope instabilities shall remain onsite or adjacent to the site <br />that could reBult in damage to the landfill or the perimeter drainage system. The <br />operator's engineering geologist shall submit documented proof of compliance with this <br />requirement t~b the LEA and RWQCB. <br /> <br />15-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.