My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44. The operator l shall design and construct the landfill in accordance with all federal and <br /> State requirements relative to seismic safety. The final design shall be reviewed by the <br /> RWQCB (pri~r to issuance of revised Waste Discharge Requirements) and the LEA (as <br /> part of the application for a revised Solid Waste Facilities Permit). RWQCB and LEA <br /> approvals shall signify that the proposed design meets all of the applicable seismic safety <br /> requirements.i To protect on-site personnel, ensure the integrity of the landfill, and <br /> minimize any disruption to landfill operations in the event of a major earthquake, the <br /> operator shall update the Earthquake Response Plan (part of the site's Emergency <br /> Response PIan currently in effect) to include post-earthquake inspection to evaluate any <br /> damage that may have occurred, ensure the integrity of the landfill containment systems, <br /> and make the landfill operational as soon as possible. <br /> <br />HYDROLOGY/WA~FER QUALITY <br /> <br />45. <br /> <br />The operator shall comply with the following RWQCB requirements based upon the <br />project description: <br /> <br />(a) <br /> <br />Prepare a Leachate Monitoring Plan. Monitoring procedures shall address the <br />amount of leachate generated, its chemical composition, and the depth of leachate <br />buildtip on the liner. Leachate monitoring activities shall comply with the site's <br />Wastd Discharge Requirements, and applicable sections of CCR Titles 14 and 23. <br /> <br />(b) <br /> <br />Prepare and submit a groundwater monitoring plan to the RWQCB as part of the <br />Report of Waste Discharge, prior to issuance of the Waste Discharge <br />Requi~'ements. Groundwater monitoring shall be conducted using background <br />and compliance wells. Monitoring well placement shall take into consideration <br />the ldcal variability in geologic materials that influence groundwater flow as <br />indicated by various conceptual groundwater flow models identified by RUST <br />EnvirOnment & Infrastructure (1994). <br /> <br />(c) <br /> <br />Prepare and submit a vadose zone monitoring plan to the RWQCB as part of the <br />Report of Waste Discharge, prior to the issuance of the Waste Discharge <br />Requkements. Vadose zone monitoring shall be conducted in accordance with <br />CCR !Title 23, Section 2550.7(d). Liquids collected in the systems shall be <br />monitr~red periodically. The operator shall remove or remediate any detected <br />conta~ninants pursuant to CCR Title 23, Section 2550.11. <br /> <br />(d) <br /> <br />Implement appropriate corrective measures in the event of leachate migration <br />pursuOnt to Section 2550.10 of CCR Title 23 shall be implemented by the <br />operator, subject to approval and oversight by the RWQCB, Central Valley <br />Regidn. <br /> <br />(e) <br /> <br />Submit a copy of the annual report prepared for the appropriate RWQCB to the <br />Planning Department. <br /> <br />46. <br /> <br />The landfill shall be designed and constructed to control drainage and erosion in <br />accordance with the facility Waste Discharge Requirements including surface water run- <br /> <br />16-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.