My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63. <br /> <br />64. <br /> <br />65. <br /> <br />66. <br /> <br />67. <br /> <br />to determin~ whether a new or amended Agreement should be adopted which could <br />include changes in the definition(s) of "proportional share" or the obligations of the <br />operator an~or other parties to the Agreement with respect to mitigating impacts that will <br />occur following commencement of the project authorized by this Conditional Use Permit. <br />It is anticipated that the roadway improvements enumerated in Conditions Nos. 60 and 61 <br />either are in~:luded in the Agreement for Roadway Improvements or will be included in a <br />new or amertded Agreement. <br /> <br />The operato[ shall participate in and pay a proportional share of the cost for a study to be <br />prepared by the Alameda County Public Works Agency. This planning study would <br />determine needed short-term and long-term safety, maintenance and other roadway <br />improvemeflts (both local and regional) in affected areas; estimated costs (with rationale); <br />cost-sharin~ instruments; and payment schedules among contributors of impacts in <br />affected are~s. <br /> <br />Within 180 days of the effective date of this permit, the operator shall enter into a <br />memorandum of understanding (MOU) with the Alameda County and ACWMA <br />to idbntify specific projects for which the operator has obligations pursuant to <br />Con~ litions Nos. 60, 61 and 62, and to establish a funding mechanism for the <br />payr ~ent of the parties' proportional shares of those expenses enumerated in <br />Con. litions Nos. 60, 61 and 62. Pursuant to the MOU, the parties shall ensure that <br />fund will be available for the County to draw upon, on an ongoing basis, as <br />nee¢ ed to meet their obligations to pay their proportional share. <br /> <br />The operator shall pay the Tri-Valley Transportation Council Regional Traffic Impact <br />Fee if and When adopted and imposed for new development projects within the region, <br />and/or a sitnilar regional traffic fee imposed by Alameda County. The fee shall be <br />imposed in proportion to other projects under review and approval. If more than one <br />regional transportation fee is adopted, the operator shall not be required to pay more than <br />once for a single project. <br /> <br />The operator shall pay the Alameda County Cumulative Traffic Impact Mitigation Fees <br />per Ordinmlce 0-88-77 within 180 days of final adoption of this conditional use permit. <br />For the purposes of computing this fee, every large truck would count as the equivalent of <br />three (3) vehicles. <br /> <br />During the a.m. peak commute period (6:45 a.m. to 8:45 a.m.) there will be no more than <br />fifty (50) tdtal refuse truck trips per hour arriving at the landfill and during the p.m. peak <br />commute hour (4:30 p.m. to 5:30 p.m.), there will be no more than ten (10) total refuse <br />truck trips arriving at the landfill. <br /> <br />The average weight of wastes delivered by truck for disposal will not be less than twenty <br />(20) tons per track, exclusive of refuse trucks originating from the San Ramon Unit. <br />Beginning in 2002, as trucks in the Davis Street Transfer Station fleet are replaced, clean <br />air vehicles will be used for hauling wastes to the ALRRF from the Davis Street Transfer <br />Station. <br /> <br />21-B <br /> <br />Final Altamont Settlement - Exhibit <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.