My WebLink
|
Help
|
About
|
Sign Out
ALTAMONT LANDOWNERS SETTLEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
ALTAMONT LANDOWNERS SETTLEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 2:28:47 PM
Creation date
5/13/2004 8:27:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/5/1999
LONG TERM AGREEMENTS - NAME
ALTAMONT LANDFILL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
WASTE MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />61. <br /> <br />62. <br /> <br />(b) Necessary improvements to roadway and intersection capacity sufficient to <br /> mitigate project contributions to cumulative roadway capacity and level-of- <br /> servige impacts in the project study area. <br /> <br />The operator's payment toward the cost of the traffic impact monitoring and <br />improvemeflts enumerated above shall be based upon the project's proportional share of <br />the total increase in traffic above existing levels at the enumerated intersections and on <br />Altamont p~ss Road. The operator's proportional share shall be increased for the impacts <br />of larger vellicles, and shall be decreased for traffic for which the Alameda County Waste <br />Management Authority or other Alameda County agencies or jurisdictions have collected <br />a fee to be uSed at least in part for traffic mitigation. <br /> <br />In cooperation with and under the supervision of the Alameda County Public Works <br />Agency andl the City of Livermore, the operator shall pay a proportional share of the cost <br />of the follqwing to help mitigate additional project-related and cumulative structural <br />section and roadway maintenance impacts in the project study area: <br /> <br />(a) Necessary safety, maintenance and structural improvements to roadway and <br /> intersection sections to the extent needed to mitigate project contributions to <br /> roadmay deterioration and maintenance requirements in the project study area; <br /> <br />(b) Impiementation of long-range Alameda County plans to resurface and reconstruct <br /> affected portions of Altamont Pass Road to the extent needed to mitigate project <br /> impOcts; and <br /> <br />(c) RegUlar maintenance of the affected portion of Altamont Pass Road, including <br /> app!ication of sweeping, chip seal, repair of roadway shoulders, and maintenance <br /> of proper roadway drainage. <br /> <br />The operator's payment toward the cost of the safety, maintenance and structural <br />improvemebts enumerated above shall be based upon the landfill's proportional share of <br />the overall ~mpact to the roadway and structural degradation on the affected roadways. <br />The operatq, r's proportional share shall be increased to account for the impacts of larger <br />vehicles an{l shall be decreased for traffic for which the Alameda County Waste <br />ManagemeOt Authority or other Alameda County agencies or jurisdictions have collected <br />a fee to be Osed in part for roadway safety, maintenance and structural improvements. <br /> The operator shall pay its proportional share of the costs of roadway maintenance and <br /> structural section improvement projects as identified in the "Alameda County-Alameda <br /> County Waste Management Authority-Oakland Scavenger/Waste Management of <br /> Alameda Gounty, Inc. Agreement for Roadway Improvements on Altamont Pass Road <br /> from ISR 580 to Altamont Landfill and Its Vicinity." Alameda County recognizes that <br /> the obligations of the operator and the definition of "proportional share" for the purposes <br /> of mitigatigg impacts that have occurred and will continue to occur are defined in the <br /> Agreemen~ for Roadway Improvements. The project could result in additional traffic- <br /> related impacts not contemplated in the Agreement for Roadway Improvements (January, <br /> 1993). The parties to the Agreement for Roadway Improvements are expected to confer <br /> <br />20-B <br /> <br />Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.