Laserfiche WebLink
94. <br /> <br />95. <br /> <br />96. <br /> <br />97. <br /> <br />Prior to any determination by the Board regarding the conditions described above, the <br />Board shall hear and consider the recommendations made by the Planning Commission <br />regarding apl~ropriate findings for the conditions. The County shall hold at least one <br />Review Heating in connection with the Mid-Capacity Review and the necessary findings <br />in Livermorei <br /> <br />At the same lfime that the Planning Commission and the Board consider the <br />determinationS set forth above, but not as a condition to continued operation of the <br />ALRRF, theplanning Commission and the Board shall also consider whether the County <br />should take, 6r recommend to other agencies or parties, any further actions to encourage <br />or establish ~ther technologies or programs for source reduction, reuse, and recycling. <br /> <br />Insurance fo~ Environmental Damage. The operator currently carries insurance related to <br />environmental impairment, corrective action for landfill releases, and landfill closure and <br />post-closure Costs in the amounts described in the certificates attached hereto as Exhibit <br />"3." The operator shall continue to maintain insurance at the same coverage, and at any <br />higher cove~ge required by applicable law and regulation, during the operation of <br />ALRRF and,i as required by applicable law and regulation, during the closure and post- <br />closure periods. <br /> <br />Liner Techn(flogy Requirements. At the time each new cell within ALRRF is built, the <br />operator shall comply with the existing then current regulatory requirements for the best <br />available liner technology. <br /> <br />Davis Street Drganics for Compost. The operator shall make available, for purchase at a <br />reasonable price and use as compost material, organic material that is received at the <br />Davis Street Transfer Station operated by the operator. <br /> <br />Monthly Rel~orting Protocols <br /> <br />97.1 Solid Waste Disposal. The operator shall prepare and deliver to the County and <br /> to the Community Monitor monthly reports specifying the quantity, point of <br /> origi~ and material types of all solid waste disposed at ALRRF, including, <br /> withqut limitation, sludge, inert wastes and special wastes. <br /> <br />97.2 Altergate Daily Cover. The operator shall prepare and deliver to the County and <br /> to thb Community Monitor monthly reports setting the forth the materials <br /> receiYed at ALRRF for use as alternative daily cover as allowed pursuant to State <br /> of California regulations governing such alternative daily cover, and such reports <br /> shall ~pecify the type, source and quantity of the alternative daily cover materials <br /> received. <br /> <br />97.3 Stanc~ardized Truck Counts. The operator shall implement a standard means of <br /> coun~ng all truck trips to the landfill each day, including separate counts of <br /> transfer trucks and counts of trucks other than transfer trucks. These daily truck <br /> trip cbunts shall be compiled into monthly reports to be delivered to the County <br /> and t~ the Community Monitor. <br /> <br />28-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />